Laserfiche WebLink
. , ` <br /> PUBLIC WORKS PE�MIT COMMENTS <br /> ,��'� �� "-G��S <br /> 4. As per Public Works approved pian dated <br /> 5. Connect side sewer per City Standard #601. <br /> � � Connect side sewer per City Standard n's 601, 602, 604. <br /> 7. Connect �II rooftop downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Width _, Depth __, Length _. <br /> s �The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. . <br /> n �hSkaLt Silf' fev� � qn� Censl�uc.4rot�. fci�cins Qf'W�fLand bc�i,✓ jjEFo.�e, bCjrnnin� (JOhk, [�lo <br /> r /.�Y. lnstall erosion contro�measures as determined by the Public Works inspector, such as sif? / <br /> �� � fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per Ciry of Everett Standards for small parcels <br /> �� !T3'. Remove erosion control measures upon completion of the project prior to final approval of the <br /> `� permit. <br /> �`' �. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowad on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan n's 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Ins�ector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard n307. <br /> 17. Pave driveway from the front property line out to the street�aving. <br /> 18. Contact the Water District fcr connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan �402 with a gas trap per Standard Plan n410 is <br /> required fcr the parking area. <br /> 20. If a sewer pump system �s to be installed, the pressure line must discharge into a private <br /> manhole, then gravity floH� across the public right-of-way. <br /> � r syste � required for t ' uilding in c p e with th r ire ent f NFDA <br /> S andar s �� <br /> �� r. � � <br /> � ��� (��-�(-/�� �z ) <br /> FWComm?ms "' <br />