Laserfiche WebLink
INSPECTION REPORT , � <br /> Address �I Z �J1�.%S'T G7 <br /> Contractor <br /> �� #� Owner �N�SVERY <br /> A M Date L� l� �9G <br /> PPROVAL ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION ❑ CORRECTION REQUESTED <br /> ❑Corrections listed below MUST BE MADE before work can be approved. <br /> 0 Please contact inspector and arran�e for appointment. <br /> ❑Was not able to perform inspection. <br /> ❑CALL 259-8810 FOR REINSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PHIOR TO OCCUPANCY. <br /> �LoG <br /> Inspector _Date ��— � j� <br /> TYPE OF INSPECTION REQUESTED <br /> ❑Temp. Elect. ❑Framing U Gas Piping <br /> O Footing U Drywall, Nailing ❑ Consultation <br /> L Foundation ❑ Shear Nailing ❑Groundworh <br /> ❑Ductwork ❑Grid ❑ Siruct. Slab <br /> U Wood Stove ❑ Rouyh-in �Final <br /> ❑Masorry ❑Service J Insulation <br /> ❑Other <br /> ❑BLDG: Pmt. No. ❑MECH:Pmt. Na. <br /> ❑ELEC: Pmt. No. �PLBG: Pmt.No. � ��3 U <br />