|
w
<br /> • s j � t , � �
<br /> �. COMPUANCE
<br /> ' REDUIRED �
<br /> INSPECTION IMPORTANT:Please supply Intortnatton In the shaded boxes and check the appropriate
<br /> APPROVED�
<br /> circles.Disregard topics that don't describe your bullding or equipment.D9�LQ2 place
<br /> checks In ihe two left columns.
<br /> . a • •
<br /> ❑ ❑ QQ Exterlor slab Insulatlon, il not located on the inte�ior, shail be R-10 (Table 6-2).
<br /> � � �Exterior stab Insulatlon, if present, shall approved for below grade use and protected above grade.
<br /> p ❑ QWalis,inc�cling rim joists>shall be insulated without Compression to{T8b(e S-2}:
<br /> �R-15 hatt(Options 1,tp QR-y s iaption�tt, IV,Y,Vl,VI I) :.
<br /> p ❑ �interfor below grade walis shaii be insulated wiihout compression to(Table B 2). :
<br /> �R•75 (Options I, 11}', (�R-19(Options llt;IU,V.l'I,Ullj
<br /> ❑ ❑ �o Vaulted cellings shaA be insulated wRhoui compressfon to R-3Q(Table fi-2, At�options)
<br /> � p �i Skylight wall Insulatlon is installed and equivalent to the required wall R-values above.
<br /> ❑ ❑ �z �epor retarders shall6r, instaUed toward the warm suHaoe as represented betow (5Q2.t.sf:
<br /> Select one option for iloors,walls,and approptiate ceiiings: I `
<br /> Eloors; ,�.Plywocd W!exterior glue ', "�Poly(z a Mil) (� f�acKed batte ,
<br /> YVatls: Poty piastic(z 4 Miq Q Face-stapied, baaked batts Q PVA paint
<br /> Ceitings:�Not reguired whe�e vetttilatian 6pace averages >32"a6ove insutation,
<br /> Face stapted backed batts QPoty plastic (z 4 mill �.PUA paint '
<br /> ❑ � �Heating system afficlency and sizing requfremarrts shal(be met as rapresented below:
<br /> ❑ ❑ Heat Pump eH�lency shall be mef undarihe toliowing compliance path (S.503.a):
<br /> Q Spili system, alr source heat pump:iiSPF a 6.8,COP>3.0
<br /> Q Single package,;aU source';heat pump:HSPF z!s.s, COP'>3.6 I • ,
<br /> Q Water source heat pump:COP z 3.8:
<br /> � Ground source heat pump C�P z 3A ! '
<br /> ❑ ❑ �s Central torce-al�furnace AFUE xating, as listed in the GAMA pireclory, shaU be:
<br /> ;1�2 .78 (Options I;IIt,1V,UI,VII) (�z .88 (Option ill}� Qs 74(Opiion 1�) '
<br /> � ❑ e Non�central,combnstlon heat�ng systems shali have intermitent ignttian
<br /> ❑ ❑ � Maximum heating system output {150%of design heat ioad) is V�� �"� BTU/hr:�5.503.2.2y
<br /> p p a Hlgh efticlency torcetlalT Turnace (s 56,000 BTU/hr.oulput)may may axceed 150"loot DHC
<br /> hecause: QGAMA listed AFllE is� 78+;4 per each'SODD BTUJhr outputlhat it exceeds!he �tiL. '
<br /> WSEC Insulatlon phase requirements:
<br /> Inspected by: Date
<br /> , . ,
<br /> ❑ ❑ �s Envelope Floars shall be insulated wfthout compression, and with support s 2A"�.C.to:
<br /> {�jRi9{OptionS i, II, lll, IV, V) �jR25 iQP�ions VI, V{n :
<br /> p p �o Non•vaulted,attic cellings shail 6e Insuiated without compression to: I See Tabie 6-2
<br /> �R-30 tOplions f, II, ID,IV,V, Vlp Q 838 (Optfon Vp
<br /> ❑ ❑ �Ooor systems shali meet:(R�,�U.40 (AU options)
<br /> Doortypes are (1) (�) S3� "
<br /> _
<br /> Page 5 of 6
<br />
|