Laserfiche WebLink
m INSPECTION REPORT <br />� %! Address q1 7) �e -- <br />Contractor—Ar (U tin <br />Owner L D Sk i, C, <br />Date — — _j=�`� 9-1� <br />J APPROVAL J PARTIAL APPROVAL <br />VIOLATION ,CORRECTION REQUESTED <br />J Corrections listed below MUST BE MADE before work can be approved. <br />j Please contact inspector and arrange for appointment. <br />J Was not able to perform inspection. <br />)IMALL 259-8810 FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OrCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector _ Date !`S <br />TYPE OF INSPECTION REQUESTED <br />❑ Temp. Elect. <br />'J Framing J Gas Piping <br />U Consultation <br />Q Footing <br />❑Drywall, Nailing <br />❑ Foundation <br />❑ Shear Nailing J Groundwork <br />❑ Ductwork <br />❑ Grid U Strucl. Slab <br />❑ Wood Stove <br />8fiough-in Q Final <br />❑ Masonry <br />Q Service ❑ Insulation <br />❑ Other <br />❑ BLDG: Pmt. No. <br />:Ijpnl Q MECH: Pmt. No. <br />/ <br />❑ ELEC: Pml. No. <br />BG: Pmt. No.—'/� l_qD--- <br />