Laserfiche WebLink
[ANC CHECKLIST <br />1COMPLIANCE <br />991 WSE ESIDENTIAL COMPREQUIRED <br />ON r 'IMPORTANT: Please supply Information In the shaded boxes and check the appropriate <br />APPROVED J circles. Disregard topics that don't describe your building or equipment. nQ NOT Place <br />checks In the two left columns. <br />FRAMING PHASE (Continued) <br />... .... See the Washington glazing directo <br />ry <br />0 19 F Glazing/skylights by types <br />No. Manufacturer Frame material #Layers Model # Area (Ft2) Uo value Tested? <br />U. Yes 0 <br />U. Yes <br />U.— Yes 0 <br />U. <br />U_ Yes 0 <br />u._ Yes 0 <br />U Yes 0 <br />U.— Yes <br />U Yes <br />floor wea before dwbring, S. 602.72) U.— Ye 0 <br />C3 E3 10 Single Glazing (No more than 1%of heated Type: No: Area: X2 U. Yes <br />0 <br />Yes O <br />Type: <br />No: Area X2 U . .. ... <br />EJ 0 11 Untested Glazing (Use -lydef-ItU-1aluffl, in Chapter 10,s- 1006-1) <br />Type: No: Area: U.— <br />NOR U.— <br />Type: No: Area: <br />TOTAL GLAZING AREA (Add entire column) ..... . <br />3, <br />- Q, N, <br />1 (8, 17.j);jj�derivedby <br />E3 (I ed g azing BF,04 <br />ola,z <br />fj.� 'JIM, r Xot <br />gj � V <br />W <br />""Ayr <br />.. .......... <br />r is <br />Mocumentetlon ll <br />Insufficient,1 —values shall <br />CD 014GIazing air leakage(S. 502-4.3 (c)) measures shall be met as follows: <br />❑ fixed site built: stops with sealant. d with closer <br />❑ operating site built: weathers'Appe —A hind partition studs/comer <br />M is Concealed insulatio" shall be placed: Xbehind showeritub gkoe <br />C] 16 Standard air leakage (S. 502.4.3) caulking is complete and installed in the following locations <br />6M 1) between Sole plate/subiloors 4) partition stud penetrations <br />5) light fixture/ flue penetrations <br />2) wiring/plumbing/duct register penetrationsA i A-w and door f— — <br />3) rim joists/mud sills (heated lower floors) 6) aroun w n page 3 of 6 <br />