Laserfiche WebLink
� ��? P(ISTiNG � ° T � <br /> ' CLOSSD C!t WORI( ORDERS REPORT <br /> Total Utility Maintenance Manaqement System <br /> 12/03/1996 Paqe 1 <br /> _______________________________________________________________________________ <br /> Date Range :O1/09/1989 - 11/27/1996 <br /> CM Work Order Ranqe :1001091070001 - UT2600-02- Pattern :7101196649043 <br /> Item Range :<Blank> - WW22020001 Pattern :* <br /> Proqram ALL Function ALL Activity ALL <br /> _______________________________________________________________--- <br /> CM WORK ORDER ID: 7101196649043 Title: SO .75 INCH 3614 FRIDAY AVE <br /> Item ID: -- <br /> Location ID: -_ <br /> Program 710 Function 119 Activity 664 <br /> Date Completed: 11/08/1996 <br /> Overall Craft: <br /> Issued: OS/12/1996 Issued by: Assiqned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Readinq: <br /> Downtime: 0 hours <br /> status: <br /> ..,;l, <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> -- ------ ------------------------------ <br /> ----------- ---------- ---------- <br /> UL CSG CAVANAH, SHANE G. 0.00 8.00 104.56 <br /> WST WDT WALDEN, DAROLD T. 0.00 8.00 163.60 <br /> Total Labor Cost: 268.16 <br /> liaterials: <br /> y.` ID <br /> .. Description Date k Used Cost <br /> -------- ------------------------------ <br /> ' -------- -------- ---------- <br /> ADAP34000547 ADAPTER 3/4° MIP X INSTA-TITE@ 11/07/1996 1 8.14 <br /> _ _ BOX000056247 BOX METER PLA 15�� X 10° W/LID 11/07/1996 1 12.90 <br /> CORP34001847 CORP STOP 3/4" CCT X INSTA @ 11/07/1996 1 15. 10 <br /> COUP34003947 COUPLING 3/4" 1/4 BEND COPPER@ 11/07/1996 1 7.53 <br /> _ ELL034104247 ELL 3/4" 90 DEG STREET BRASS ^ 11/07/1996 1 1.55 <br /> METE36089447 METER 5/8° X 3/4" NEPTUNE T-10 11/07/1996 1 30.67 <br /> N/A TRACING WIRE 11/07/1996 32 3 .52 <br /> PIPE34060647 PIPE 3/4�� POLY I.p,S. 11/07/1996 31 7.13 <br /> SADD44016847 SERVICE SADDLE 6" W/3/4" CCT 11/07/1996 1 10.55 <br /> SETT34033647 SETTER COP 5/8" X 3/4" (H12") 11/07/1996 1 52.73 <br /> Total Material Cost: 149.82 <br /> Vehicles: 3,50�, <br /> r------ <br /> i�__________ Description Hours Ca$t ��'�° ,3� <br /> ------------------------------ ------ <br /> V2117 91 CHEV 1-TON HYD UNIT 8.00 44 80 <br /> �/FIOG03 94 CAT BACKHOE 8.00 223.20 <br /> VT0007 94 ATLAS COMPCO COMP. 8.00 56.80 <br /> Total Vehicle Cc-t: �24.80 � <br /> Wnrk Description: <br /> ------------------------------------------------------------------- <br />