Laserfiche WebLink
. � � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public�JVorks approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br />' t <br /> �.) Connect side sewer per City Standard #'s 601, 602, 604. <br /> �� <br /> � Connect all rooftop�},downspouts to the side sewer. <br /> l�. o�d focfi��g dra�ns <br /> 8. Connect rooftop downspouts to lhe drainage system provided for this ;nt. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per C�ty of Everett <br /> Storm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> 10. The contractor must meet with the Public Works Inspector to disr,uss potential drainage <br /> routing prior to beginning the project. <br /> '` 11 Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Inslall erosion conlrol measures per City of Everett Standards for small parcels <br /> ;3. Remove erosion control measures upon completion of the project prior to final approva! of the <br /> permit. <br /> 14. All excavated material from foundation, sidewalk and driveways shall be hauled tc an <br /> approved, pertnitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> �� Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. . . . ��..�sl, uc/ie�� <br /> fnee-l� wi ti �kr �u lr� �' �ks inSP¢Ctov� I'F�ondinJr dt ��.��.;��� , St�.,f.�;,3 W��'� • <br /> 18. Contact the Water Distric!for connecting p��isio"n� for'ihis building's <br /> water and sewer services. <br /> . <br /> E 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> F-� required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />;; manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this buiiding in compliance with the requirements of NFDA <br /> Standards 13D. <br /> .:c:T,�_ , � ��`� ) <br />