Laserfiche WebLink
i <br /> i <br />� <br /> I <br /> everett INSPECTION REPORT <br /> � G <br /> Address �9�!Cn� � <br /> Contractor rC ���+/�� <br /> Owner <br /> Date � �`� 9� <br /> TYPE OF INSPECTION REQUESTED <br /> L�BLDG: Pmt. i�o. ���� ❑ MECH: Pmt. No. <br /> C] ELEC: Pmt. No. ❑ PLBG: PmL No. <br /> ❑Temp. Elect. � Framing ❑Gas Piping <br /> ❑ Footing ❑ Drywall, Nailing ❑ Consultation <br /> `�Foundation ❑ Shear Nailing ❑ Groundwork <br /> ��`J Ductwork ❑ Grid ❑ Struct. Slab <br /> ❑VJood Stove ❑ Rough-In � Final <br /> ❑ Masonry ❑ Service � <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION �CORRECTION REQUIRED <br /> ❑ Corrections listed below MUST BE MADE before work can be approved <br /> ❑ Please conlact inspector and arrange for appointment. <br /> ❑Was nut able to periorm inspection. <br /> ❑ CALL 259•8810 FOR REINSPECTION — 24 hour notice requi�ed. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> �5��-----I��� <br /> �c� <br /> Inspector _ -- <br /> Date � <br /> I <br /> � <br /> I <br />