Laserfiche WebLink
CLOSSD Qf WORR ORDffiLS REPORT <br /> Total Utility Maintenance Management System <br /> OS/23/1996 Page 1 <br /> -------------------------------- --- — <br /> Date Range :O1/09/1989 - OS/22/1996 <br /> CM Work Order Range :1001091070001 - UT1002- - Pattern :7101236710070 <br /> Item Range :<Blank> - WW22020001 Pattern :* <br /> Program ALL Function ALL Activity AT•T• <br /> -----_----_______________------------------ ----- <br /> CM WORK ORDER ID: 7101236710070 Title: REPAIR - 4102 FRIDAY AVE <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: DC83095B06 -- CATCH BASIN <br /> Location ID: -- <br /> Proqram 710 Function 123 Activity 671 <br /> Date Completed: 07/30/1996 <br /> Overall Craft: <br /> Issued: 07/30/1996 Issued by: WLK Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Readinq: <br /> Downtime: 0 hours <br /> Status: <br /> Lebor: , <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> HEO AAI, ARNOLD, ARTHUR L 0.00 8.00 157.04 <br /> SUPl I►GI► aFiLES, GREGORY A. 0.00 2.00 43.82 <br /> DL HJT HOUSTON, JOSHUA T. 0.00 5.00 64.00 <br /> UL MHP, N?,ROON, HERBERT ARTHUR 0.00 5.00 104.56 <br /> EO MJL2 HITCHELL, JEFFREY L. 0.00 5.00 152.08 <br /> Total Labor Cost: 521.50 <br /> 1[aterials: <br /> ID Description Date �' Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> BRIC00061156 BR"'�K CONCRETE 2° X 4" X 8" 07/29/1996 24 9.60 <br /> CII�00061438 CEKENT 20 MIN. SET 50 LB. BAG 07/29/1996 2 22•b2 <br /> COUP44300147 COUPLING 6^ CONC X 6^ Cl/PL 07/29 1996 1 6.67 <br /> N/?, FR2,ME/GRATE (ASSOC) 31/1996 211.49 <br /> N/A C.n.F. (ASSOC) 07/31/1996 1 53.95 <br /> PIPE44304247 PIPE 6° PVC SEWER 07/29/1996 2 2.70 <br /> Total Material Cost: 307.0 <br /> a� <br /> vehioles: 11l .s9. <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V3507 88 CASE HACKHOE 4X4 8.00 342.40 <br /> VJ0004 �95 CHEV 1-TON 8.00 48.80 <br /> Total Vehicle Cost: 391.20 <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br /> REPAIR CATCH BASIN <br />