My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1717 FULTON ST 2016-01-01 MF Import
>
Address Records
>
FULTON ST
>
1717
>
1717 FULTON ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 2:30:50 PM
Creation date
2/11/2017 2:30:39 PM
Metadata
Fields
Template:
Address Document
Street Name
FULTON ST
Street Number
1717
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � ( � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard #601. <br /> 5. Connect side sewer per City Standarc #'s 601, 602, 604. <br /> � Connect ali rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for tliis iot. <br /> 8. Rooftop runoff must be discharged lo a roof downspout infiltration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size irench is 3.5'wide, 2'deep and 25' long. See attar.hment for <br /> more details. <br /> � The contractor must mee!wilh lhe Public Works Inspector to discuss potential drainage rouling prior to <br /> beginning the project. <br /> 10. Install erosion control measures as determined by the Public Works inspector, such as silt(ence, straw <br /> bales, swales,or erosion blankets. <br /> 11. Insfall erosion control measures per City of Everelt Slandards for small parcels <br /> 12. Remove erosion control measures upon comptetion of the project prior to final approval of lhe permit. <br /> 13. All excavaled material from Foundalion, sidewalk and drive�vays shall be hauled to an approved, <br /> permilted sile. No wastinc� of material is allowed on this building lot. <br /> 14� No diri, mud, rocks or debris to be tracked onto roadway. <br /> 15. No building malerials to be stacked on sidewalks and side�valks lo be hept clean and open for <br /> pedestrian travel. <br /> 1 G. Adjust waler meler box 1"above sidewalk c�rade. <br /> 17. Remove and replace curb, gulter and sidewalk as per City of Everell Standt.rd Plan #'s 305A 8 306 on <br /> ihis proposal's frontage as directed by lhe Public Works Inspector(i.e. all unused driveways and any <br /> broken or damac�ed area must be replaced). <br /> 1 F3. Install a Type I concrete driveway per Cily of Everelt Slandard#307. <br /> 19. Pave driveway from lhe front property line out to the slreet paving. <br /> 20. Contacl tlie Water District for connecling provisions for lhis building's water and <br /> sewer services. <br /> 21. A calcli basin as per City Standard Plan it402 wilh a c�as irap per Standard Plan #410 is required for the <br /> parking area. <br /> 22. If a sewer pump syslern is to be installed, the pressure line must discharge inlo a private manhole, then <br /> gravity flow across tha public ric�lit-of-way. <br /> 23. A sprinkler system is required for ihis building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> FIVComnienls ,�J/A <br /> �v <br />
The URL can be used to link to this page
Your browser does not support the video tag.