Laserfiche WebLink
, - <br /> l �. <br /> i <br /> i <br /> PUBUC WORKS PERMIT COMMENTS ; <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> � Connect side sewer per City Standard #'s 601, 602, 604. <br /> � Connect all rooftop downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to the drainaa2 system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout in�iltration system per City of Evarett <br /> Storm Manual 3-2.6.2. Width_, Depth _, Length _. <br /> 10. The contractor must meet with the Public Works Inspector to discus� potential drainage <br /> routing prior to beginning the project. <br /> � <br /> 11.�Install erosion control measures as dete�mined by the Public Works inspector, such as silt <br /> � fence, straw bales, swaies, or erosion biankets. <br /> 12. Install erosion controi measures per City of Everett Standards for small parcels <br /> , _� <br /> ( 13. Remove erosion control measures upon completion of the project prior to final approval of the <br /> 1permit. <br /> 14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this tuilding lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan n's 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 10. Install a Type I concrete driveway per City of Everett Standard �307. <br /> 17. ave driveway from the�property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan n402 with a aas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must d;scharge inio a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sorinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> z� <br /> L <br /> PWComments <br />