Laserfiche WebLink
( ; <br /> . 6. The shower in the downstairs bath is required to be zccessible. UBC 1105 & <br /> I106.11.10.1. If die "transfer" confieuration is choseu, the stall is required to be <br /> 36" x 36", no more, no Iess. A seat is required and a maneuverabiliry area as <br /> described in Sec. 1106.11.10.2.1. <br /> 7. The plans indicate unheated cabinet shop and warehouse areas. De,a;ls indicate 4" <br /> of rigid insulation on the roof. The only insulation requirement for a "semi-heated" <br /> space would be to have R-9 outside or R-19 inside of the roof structure. Having a <br /> "semi heated" space would appear to be advantageous in that the sprinkler system <br /> could be protected from freezing. Should the "semi-heated" path be chosen, a note <br /> should be added ro require the heating equipment output ro be between 3 and 3 <br /> BTU/(h.ft.'). <br /> S. Apparendy the prescriptive path is beine used for the rest of the building. [f so <br /> further information is required such as footine perimeter insulation, U-values for <br /> windows and doors, type ot heat, separation wall insulation, etc. If a component <br /> path is chosen, please provide the calculations. <br /> Please provide a response letter shuwing where each item in this correction letter is <br /> addressed un the plan set. <br /> Upon resubmital of the drawings, your application will he �aiven priority and plan review <br /> will commence. <br /> All required subtnittals shall be of sufticient detail and contain sufticicnt information to <br /> ensure that the proposed structure will be constructed in compliance with all adopted <br /> codes. <br /> Sincerely, 1 � � � (' <br /> �� � � <br /> t� <br /> Steve Miller <br /> Associate Gneineer <br /> s�i:��uiui-���i�, <br /> 1 <br /> � <br /> ��L <br />