Laserfiche WebLink
� � � <br /> 38. Provide insulation bafFle at attic. Provide section drawing showing requirements of <br /> baffle. <br /> 39.This dwelling shall comply with the 2009 International Residenlial Code �IRC). (General <br /> Notes). . <br /> 40. Specify roof pitch on elevation drawings. <br /> 41,The section drawing shows a ceiling height of 7'6", the door schedule calls out 7'-0" <br /> doors, the plans call out "new headers to be built-up 2 x 10's". <br /> Please prepare a response letter showing where each item in this correction letter is <br /> addressed on the plan set. . <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> ���� <br /> Jeff Heilman <br /> Development Technician <br /> 425-257-8976 <br /> Email: iheilmanC�ci.everett.wa.us <br /> 4/y <br /> S:UCommonlClcticalUHc�Iman�CUD7�OM l471D l:arAnnr nvnl Mr <br />