My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6620 GATEWAY TER 2016-01-01 MF Import
>
Address Records
>
GATEWAY TER
>
6620
>
6620 GATEWAY TER 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 3:51:31 PM
Creation date
2/11/2017 3:51:25 PM
Metadata
Fields
Template:
Address Document
Street Name
GATEWAY TER
Street Number
6620
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( ("_ <br /> lv l0 20 ��� tti�ay .lGvl�c�— <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Wor!cs approved plan dated <br /> 5. Connect side sewer per Ciry Standard #607. <br /> / 6./ Connect side sewer per City Standard #'s 601, 602, 604. <br /> L� <br /> ?. Connect all rooftop downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> � Rooftop runoff must be dischar�ed to a roof downspout infiitration system per City of Everett <br /> Stortn Manual 3-2.6.2. Width �, Depth �, Length �. <br /> 10. A catch basin as per City Standard Plan �402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> i t. Remove and replace curb, gutter and sidewalk as per Ciry of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways a�d any broken or damaged area must be replar,ed). <br /> 12. Install a Type I concr�.e driveway per City of Everett Stan�ard #307. <br /> 13. Pave driveway from the front property line out to the street paving. <br /> 14. Contact the ___ Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then graviry flow across the public right-of-way. <br /> 16. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 17. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> I� /aLl. G—;�Cskv�.-(L. I� iLl �}l"_C_'� �,r�-L F- 2r %Y] /=G�v4.',�GT7cA <br /> 5 � O� �c'/-FLK . D�i �'z ��a•� � .-�CG �� E HavLc—�� To R-ti' . <br /> �`�i�z�L'c7� � <br /> ri2i7 �:���� 'S:�; j�;o .,t�SiC�iUc� Cr /Ii��1i,vL <br /> � <br /> C �l -FGt� �v/LL/�C�C) ,(..L' � , <br /> PwCammenn � <br />
The URL can be used to link to this page
Your browser does not support the video tag.