Laserfiche WebLink
�CT-12—'93 09t�8 ID:CITY OF EVEP.ETT PLAId TEL Ii0:3D6-259-8^42 q739 P�5 � <br /> (- � <br /> f � �� 7 <br /> • Loren & Dlanne Jenaen `� ` <br /> r•� � <br /> Page 3 �°- T <br /> �� <br /> ,, < <br /> 1) Conduct an asaesament (quantitetive and qualitative) of the functions and � ; <br /> values of the habitat onsite prior to clearing. This also will require delineation of ; j <br /> the wetland and buffer, survay, mapping and summary of their acreage's. On �� � <br /> the tasis of existing wetland acreage and buffer size, ils functions and values � : <br /> prior to clearing and mitigetion requiraments of Section 37, establish the type �: <br /> and quantity of mitigation required. Our preliminary estimates indicate that there t. ' <br /> ' are approximately .8 acres of altered wetlend and 1.2 acres of altered buffer. � ; <br /> i <br /> 2) I d e n t i f y s u i t a b i e o f f s i t s m i t i y a t i o n s i N s. T h e s t u d y a h o u l d f o c u s o n the , <br /> mouth of Pigeon Creek #2 and any other suitable sites where mitigation can be � <br /> feasibly undertaken. ` <br /> ,� ;. <br /> 3) Dev�lop Mit(g�tlon Plen, The mitigetion plen ahall include grading � � <br /> contours, hydrologicsl analysis (demanstrating that suitable hydrology is <br /> available), planting scheme (including spacing and soil treatments), provision for � <br /> hydric soils and suitable organic meterial in the mitigadon wetland and buffer <br /> area. The plan must demonstrate that equivalent or superior 'Yunctions and <br /> values° to the cleared wetlend and buffer will be provided by the mitigation site. �. '; <br /> A monitoring plan shall also be included. T.�e plan shall be submitted first in a � ; <br /> conceptual and then in a final form, both of which will be subject to review and { <br /> approvel by the Plenning end Utilities Staff. Attached is a draft set of guidelines � ' <br /> for the preparation of mitigation and menitoring plans. ;. <br /> 4) Implementetion. Su�cient funds shall be provided far the actual creation <br /> and/or anhancamant of the mitigation wetland and buffer. Preliminary estimates <br /> indicate thet the 0,6 acres of wetland can be mitigated at $40,000 per acre. At a <br /> 3:1 mitigation ratio, this would require 2.4 acres of wetland mitigetion or $96,000. <br /> Buffer mitigation is estimated to cost approximately $10,000 per acre or $12,000. <br /> Therefore, totel mitigution is estimated to cost approximetely 3108,000 not : <br /> including planning costs. To ensura that implamentaUon is carried out, the <br /> Clty will require the posting of a bond for 5108,000. : <br /> It ahou/d be notad fhat no conshuctMn on your property wlll be pern►itfed � ` <br /> unNl the mltlgaUon progrem ouHlnod above ia completed to the ' <br /> saNsfactlor� v/the Clty(SacNon 37.Oa0.C.7). � <br /> Minimlz/ng Potentlel Slope Erosion and Sl/ding Onslte '. <br /> The measures below are not considered to be mitigation for the clearing and are � <br /> intended to stebilize the site to prevent any further environmental damage, i <br /> 4 � <br /> e ' <br /> %' i <br /> � s <br /> s <br /> T <br /> � <br />