Laserfiche WebLink
.. - <br /> SUBSURFACE EXPLORATION, GEOLOGIC HAZARDS AND <br /> PRELIMINARY GEOTECHNICAL ENGINEERING REPORT <br /> GOLDBERG PROPERTY <br /> 4700 BLOCK OF GLENHAVEN DRIVE <br /> EVEREI"f, WASHIIVGTON <br /> January 15, 1998 <br /> Project No. G97246A <br /> I. PROJECT AND SITE CONDITIONS <br /> _ 1.OINTRODUCTION <br /> � This report presents d�e results of our subsurface exploration, geologic hazards and <br /> preliminary geotechnical engineering study for the proposed single family residence to be <br /> _ constructed on the Goldberg property. The proposed building location and approximate <br /> locations of the explorations accomplished for this study are presented on the Site and <br /> Exploration Plan, Figure 1. In the event that any changes ui the nature, design or location of <br /> the strucmre are planned, the conclusions and recommendations contained in this report should <br /> be reviewed and modified, or verified, as necessary. <br /> 1 .1 Purpose and Scone <br /> The purpose of this study was to provide subsurface data to be utilized in the design and <br /> ' development of the siibject project. Our study included the excavation of exploration pits, <br /> completion of geologic studies, and a review of the USGS geologic map of [he Everett <br /> Quadrangle by James P. Minard to assess the rype, thicl�ess, disu-ibution and physical <br /> properties of the subsurface sed'unents and shallow b ound water conditions. Geologic hazard <br /> evaluations �nd engineering studies were also conducted to determine suitable geologic hazard <br /> mitigation techniques, the depth to foundation bearing sedimenu, the type of suitable <br /> foundation, allowable foundatiun soil bearing pressures, anticipated foundation settlements, <br /> iloor support recommendations, drainage and erosion coasiderations. This report summarizes <br /> our current field work and offers geologic hazard mitigation and ;eotechnical design <br /> recommendations Uased on our present understanding of the project. <br /> ].2 Autliorization <br /> Nritten authorization to procced with d�is study was granted by Mr. Hrnvazd Goldberg. Our <br /> study was accomplished in general accordance �vith our proposal dated August 22, 1997. This <br /> report has been prepared for the exclusive use of Howard Goldberg and his agents, for specific <br /> application to this project. Within die limitations of scope, schedule and budget, our services <br /> have becn perfonned in accordance with �enerally accepted geotechnical eneineering and <br />