My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4725 GLENHAVEN DR 2016-01-01 MF Import
>
Address Records
>
GLENHAVEN DR
>
4725
>
4725 GLENHAVEN DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 4:24:47 PM
Creation date
2/11/2017 4:24:39 PM
Metadata
Fields
Template:
Address Document
Street Name
GLENHAVEN DR
Street Number
4725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;_�, . . <br /> � TU • <br /> r <br /> Mayor Anderson CV��'�fr <br /> I FROM <br /> Frank ft. Bennett <br /> o�re <br /> Auquat 6, 1974 <br /> SUbJECT �'��;__,��}.�y� <br /> John Da��son'e Residence CITY OF CVERCTT, EVERETT, WqSHINGTON vpi k <br /> I have discuased With the inspeetora involved the progress of <br /> construction of the John Daweon home at 4725 Glenhanen Drive. <br /> Afr. Da•.vson was issued a building permit for a $55,00 haae on <br /> November 16, 1973. He paid the following charges; <br /> Building Permit $240.75 <br /> Water sernice Permit 125.00 <br /> Driveway Permit 12,50 <br /> Sewer Permit Fee 30.00 <br /> Durinq the course of conskruction there were seven inspectione <br /> made by the Building inspector, four inspections made by tAe <br /> Planning Inspector, and three inspectiona made by the Electrical <br /> Inspec�or. These covered the time period from December, 28, 1973 <br /> thru April 26, 1974. <br /> No final inspection was ever called for by Hr. Dawson or hia em- <br /> ployeea and to date no final ins ction had been made on the struc- <br /> ture. Apparently the ouae n now occup y t e weona. A east <br /> some furniture had been muved in. Occupancy by an owner prior to final <br /> ! inapection, eapecially one who acts as his own contractor, is a cons- <br /> �tant problem. We hane no way of knowing when the project is completed <br /> and understandingly thQ owner wants to occupy his new house as soon <br /> as possible, This is a constant source of concern but apparentiy <br /> in this case had not yet been addressed. <br /> I have no idea why Mr. Dawson is critical of either the inapectors <br /> and/or procedures. The inspectors in turn can see no reason for <br /> his dissatisfaction nor are they critical of his construction pro- <br /> cedure exc:ept as mentioned, the lack of a final inspection request. <br /> Z would be haFpy to discuss this matter with Mr. Dawaon if you feel <br /> it ia desirable. //_ g, �� <br /> �14NtlE/F12q.u1< 6 <br /> //u ,l�ri u,ew , �O �is Yes/�+u�cx� `j45 /�oT b�eeL- <br /> Cow-����� 547r S���v� � — eX� �O s�rPe.� a 5 !�-�� <br /> F,�v Cn de_ I 3, 36 , 0 9 � (6� / I%ea s.e Q a�a� �o ��v' <br /> c.ov.cerc� s Utt- -�tc4 ��t5�'?,,�cT`�o... , � I <br /> � .'�;���r � I <br /> . � <br /> ; , <br /> ,;,.�ri�It,;c. ��.�a. <br /> �Y'� ....•-�1 � ���� a t�� � � �I� 1�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.