Laserfiche WebLink
everett INSPECTION REPORT <br /> eAddress `f g �d Glpn a1c�'� <br /> Contractor �Nd �10,1 0"/� <br /> Owner <br /> Date � �Z� �'q <br /> TYPE OF INSPECTION REQU[STED <br /> ❑ BLDG: Pmt. No. �MECH: Pmt. No. ��Qycj <br /> ❑ ELEC: Pmt. No. ❑ PLBG: Pmt. No. <br /> ❑ Temp. Elect. ❑ Framing ❑Gas Piping <br /> ❑ Footing ❑ Drywall, Nailing ❑ Consultation <br /> ❑ Foundation ❑ Shear Nailing ❑Groundwork <br /> � Ductwork ❑ Grid ❑ Struct.Slab <br /> �'��Nood Stove ❑ Rough•in ❑ Final <br /> ❑ Masonry ❑ Service ❑ <br /> ❑ APPROVAL PARTIAL APPROVAL � <br /> ❑ VIOLATION j�CORRECTION REQUIRED <br /> ❑ Corrections listed below MUST BE MADE bafora work can be approved. <br /> ❑ Please contact inspector and arrange for appointment. <br /> �Was not able to pertorm inspection. <br /> CALL 259•8810 FOR REINSPECTION — 24 hour nolice required. <br /> A CERTIF ATE F UCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> _, �141� � n�'� ��� ��< <br /> c� ow/ �, � <br /> — .� <br /> Inspect Date �! <br /> / r- <br />