Laserfiche WebLink
l <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved pla� dated <br /> 5. Connect s�de sewer per City Standard #601. <br /> ; 6, Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> .� <br /> �'L�-�oan r ownsp he drain vided f r , is lot. <br /> 9.� Roo(top runoff must be discharged to a roof downspout-inGltratior�system per City of Everett <br /> Storm Manual 3-2.6.2. The approximate size trencl7�3.�5'wid��deep and�25�lohg. See <br /> attachment for more details. ��� �3,p ' 1 y o ' <br /> ��10 The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> �� Install erosion control measures as determined.by the Public Works inspector, such as siit <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> 13. Remuve erosion control measures upon complelion of the project prior to final approval of the <br /> permit. <br /> 14. All excavated material from fo�ndation, sidewalk and driveways shall be hauled to an <br /> approved, permitted sile. No wasting of material is allbwed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's (rontage as directed by the Pubiic Works Inspector (i.e. ali unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the slreet paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 wilh a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is lo be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> �21. A sprinkler system is required for lhis building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> PWComments �y/ <br /> % <br />