My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4841 GLENWOOD AVE 2018-01-02 MF Import
>
Address Records
>
GLENWOOD AVE
>
4841
>
4841 GLENWOOD AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2024 2:17:34 PM
Creation date
2/11/2017 5:38:16 PM
Metadata
Fields
Template:
Address Document
Street Name
GLENWOOD AVE
Street Number
4841
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( <br /> May 5, 2008 <br /> Mr. Ron Riach/JRR Engincering, Inc. <br /> L&tA Job No. 8A043 <br /> Page 3 <br /> Soil Conditions <br /> We probed the surficial soils along the wall alignment by manually pushing a steel T-bar into the <br /> ground to get an indication of the density or wnsistency of the soils on which the proposed <br /> pmcast concretc block w�ll is to be founded. The probe bar could penetrate no more than I8 to <br /> 30 inches, indicating very dense, fresh till soils most likely lie at shallow depth below the ground <br /> surface along the wall alignment. <br /> Groundwatcr Conditions <br /> The very-dense fresh till deposit underlying the wall alignment at shallow dcpth is of extremcly <br /> low penneability, and would perch stormwater infiltrating into the more permeable surficial <br /> topsoil and weathered soils. 7'his near-surface perched groundwater would fluctuate seasonally, <br /> and the depth to and thc amount of perchcd groundwater would also depend on prccipitation, <br /> storm runoff, vegetation cover, site utilization, etc. It may dry up completely in the summer <br /> months, and accumulatc and rise in the wet winter months. <br /> RECOMMENDATIONS <br /> Gencral <br /> Thc preposed block wall is to be constructed with 2.5 feet x 2.5 fcet x 5 fcet Ultra IIlock precast <br /> coneretc bl�:ks. Thc block wall should havc gcogrid mesh reinforcement embedded in its <br /> backfill, except whcrc thc wall is no more thun 6 fect tall. A drain line should be provided along <br /> the base behind the wall to collect and drain away groundwater tlowing towards the wall. The <br /> wall should be founded on a minimum 6-inch layer of compacted 7/S-inch crushed rock base <br /> placed over fim� bearing soils. A vcrtical drainage blanket should be placed against the back of <br /> wall, which should bc hydraulically connected to the drain line. The remaining wall backfill <br /> should be compactcd stn!�tural fill consisting of cican granular soils. Onsite cican sandy soils <br /> LIU & ASSOCIATES, INC. <br /> 3/r-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.