. \¢S '1�
<br /> A
<br /> ,� , . � o . o . - �� ir�` =
<br /> 18 MAX. , . .� ' . . 1 • o '. � .j , • .. � � `
<br /> ' . , , �e _ � . / � .
<br /> _ _i d '� ` ' J' ' o � ��
<br /> i i i '� ' • ' � • ' �.
<br /> 2,� • 2,5x5 � � � ' . , ' ' /•• ` • ' JI!
<br /> Ul.T� 61.0 ' � ' ' � " . � � �, ' . �
<br /> PRC�n.sT �� ' � ' . '. J• ' .�� • . � ' �
<br /> ° � • ° • ° � ` �-?GO�KI D
<br /> �I.OG�CS r � • ` � • , o
<br /> � \
<br /> s � , , �/ o . , • � � - ; I`I M ESN �rYP. ,
<br /> N i2"Mirl. ^ ' �.. � , � , � .o , .• ° • f!
<br /> � �� . . • , � o , • � �TKU�TURA�-
<br /> 4 . ' • : v . � � FILL
<br /> � a . � • , ' , .
<br /> � , . , e . , , o �
<br /> u 'o ` o
<br /> C�K���. 9�0 0 ♦ • . '' ,J �. � � J � O �
<br /> �1 R/aDG / ' , . , .. • , ' .
<br /> 4 J
<br /> .1 � O • ��'
<br /> r a ' d
<br /> / 7 �d J• � . , ' ° '` ' ., ,, �
<br /> < , . o ` . ., . ��
<br /> 12" MiN- 'i � '�: ^ �a � � ,� � ,�, - � ��� PbRF, PVG
<br /> rr '�
<br /> �o M1�1. ,, � � , o , � a ° � ' a " a � a � U DRAiN PIPE ull
<br /> - = i _i�ilrii _ � _ — _ �i�r� �,�Ri� ho�k
<br /> �IB�' GP�sN�� Roc.kJ
<br /> NOTES:
<br /> 1. Construction of ecology biock wall should proceed immediately following completion of cut banks and keyway
<br /> trenches.
<br /> 2 The base-course blocks sliould be set on a minimum 6-inch layer of compacted 7/8-inch crushed rock base over
<br /> firm undisturbed subgrade soils of 3,000 psf bearing capacity, and should be embedded at least 12 inches below
<br /> the finish grade in front of the walls.
<br /> 3. A 5-inch-minimum, perforated, PVC drain pipe fitted with a non•woven filter fabric sock should be placed behind the
<br /> base-course blocks of the block wall. Water in drain line should be tightlined to discharge into a storm sewer or a
<br /> suitable stormwater disposal faciiity.
<br /> 4. Structural fill should consist of ciean granular soils iree of organics and debris, with partictes no larger than 4 inches.
<br /> 5. A vertical drainage blanket, consisting of compacted 718•inch crushed rock wlth a thickness of at least 12 inches
<br /> horizontally, should be placed against the back oF block wall.
<br /> 6. The drainage blanket crushed rock fill and structural fill should be placed in lifts no more than 10 incties in loose
<br /> state aftar completion oi each course of blocks, with each li(t compacted wilh a vibretory mechanical compactor to
<br /> at least 95%of the maximum dry density determined by ASTM 01557 (Modified Proctor method)
<br /> 7. Geogrid mesh should be laid over Flat fiil surface, securely anchored between lwo rows of blocks at one end and
<br /> stretched tight and staked down at the other end, before placing the next lift uf fill. Overlap of geogrid mesh should
<br /> be at least 12 inches along direction of wall alignment and not allowed in direction perpendicular to wall alignment.
<br />�
<br /> LIU & ASSOCIATES, INC. TYPICAL SECTION
<br /> GemeUmical Engineering� Engineering Geology� Earth Science PRECAST CONCRETE BLOCK WALL
<br /> JOB NO. 8A043 DATED 512l2008 PI1\TE N0. 1