Laserfiche WebLink
. <br /> �I- iC�-G9 <br /> JRR Engineering, Inc. <br /> 18609 76'"Avenuc West, Suitc B <br /> Lynmvood, WA 98037-4149 <br /> Phone: (425)697-5108 <br /> Far: (425)697-4506 <br /> September 30, 2009 <br /> Tony Lee, Pertnit Services Manager <br /> City of Everett <br /> Code Compliance <br /> 2930 WetmoreAvenue <br /> Everett, WA 98201-4044 <br /> SUBJECT: Popov Wall Replacement per volation Citation, 4841 Glenwood Avenue, Everett, JRR# <br /> 08-42 <br /> REF: Case#08-0138 <br /> Dear Mr. Lee: <br /> As noted in our comespondence da;ed 9/23/09, survey points indicated the batter on the front face of <br /> the wall is less than required by plan. On 9/28 the wall was checked again and approximately 30 linear <br /> feet of the wall has a batter of zero to less than 1-inch over the height of the wall rather than the 7.5- <br /> inches required. Based on a minimum rotation to develop"active" pressure the top of ihe wall can be <br /> expected to rotate 1-inch. We will be checking the wall batter on Oct. 5'" and 12"'and hope to confirm <br /> the wall batter has not reduced further. Should the batter become negative the global stability of the <br /> wall may be compromised. <br /> Stortn drainage installation has been compieted below the wall as confimied by Randy Allen, <br /> Construction Inspector. Locking bolts were not installed on the new grates, finish grade has not been <br /> completed and therefore it can not be determined if cleanouts behind the wall have been set at grade. <br /> Cleanup and seeding has not been completed in front of the wall and the deck framing and keystone <br /> walls have not been adequately addressed as yet. <br /> Please advise if you have any questions or concerns regarding this matter. <br /> Sincerely, <br /> JRR Engineering, Inc. <br /> I <br /> f � /� i� <br /> l�r^' � C.�'.-L � <br /> onald K. Riach, .E. <br /> Cc: Owner <br /> Contractor <br /> \VCmrlc\I JRR�1.IiITGRS1084JA3.Ja <br />