Laserfiche WebLink
InspectionTvpe Date Result Remarks <br /> 4841 GLENWOOD AVE <br /> Permit: C0601-007 Status: Iasued: 2l6/O6 Flnaled: To Recorda: <br /> Description: NEW HOUSE <br /> NoteslCondilions: ' DONOTDISTt/RBARfAEA57'OFTHE290'CONTOURLINf <br /> MechRoughln 72/6I06 Approval See notes <br /> Approval as noted: <br /> Where do condensate and drain pan terminate?(attic) <br /> I can see a PVC line running to the outside soffit, but do not see where it terminates to the outside. <br /> Will need to verify this at Final. Wiq also need a ladder to attic at Final. <br /> GasPiping 12I6/O6 Approval Gas pipe OK for service <br /> InsulBldg 12/11I06 Approval <br /> Site Visit 1/3107 <none> Wilh PW inspector, see notes <br /> Supporting Pubiic Works inspector Randy Allen RE: site concerns. <br /> Final Bldg 6127I07 Corr Reqd See notes <br /> Complete guard rail, rear deck. <br /> Complete landscape, sidewalk to front entry. <br /> Lag bolts missing frmo deck ledger plate. <br /> Plumbing, Electrical, Mechanical, Fire Dept, Public Works need to be finaled before bldg. <br /> Final Plbg 7I6107 Corr Reqd See notes <br /> 1) Complete temperature and pressure drain line for hot water tank. <br /> 2) Dishwasher must pipe to an air gap and then to drain. <br /> 3)Ali fixtures shall have water to them. <br /> Please re-call plumbing Final when you have Mechanical ready. <br /> Final Plbg 7/6I07 <none> Unable to inspect, see notes <br /> 1)Water must be turned on for Final inspection. <br /> 2) Please call back in when ready--no additional fee. <br /> Final Plbg 7I72/07 Approval <br /> Final Mech 7/12/07 Approval Note: Complete stove exhaust <br /> GasPipeFinal 7/12/07 Approval <br /> Other 7/24107 Corr Reqd Wall drain, see notes(PW0601-006) <br /> Wail drain behind driveway retaining wall will have to be uncovered lo verify piping. <br /> MiscPW Insp 7/26107 <none> Ecology block wall, see notes <br /> Certification of Ecology Block Wall: <br /> City of Everelt requires special inspection and written approval of installation of ecolcgy block wall (5 <br /> blocks high). <br /> Must be turned in to City of Everett prior to Final Certification by Geotech or structural engineer. <br /> MiscPWlnsp 7/26/07 PW OKs lemp occupancy, see notes <br /> Public Works OK for temNorary occupancy. <br /> Final approval is subject to completing driveway, storm drainage, ground cover/landscaping, Geotech <br /> approval of ecology block wall. <br /> Bidg Olher 1014/07 Violation Work without permit, see notes <br /> Concrete walls/slructure placed bene2;h deck to south of garage without permimts/inspeclions. <br /> Consultation 5I1I08 <nona> Re: retaining wall (west)-see notes <br /> Consultation with engineer of record concerninc� retaining wall repairs <br /> T.L 8 R.A. co-inspecting <br /> Bldg Other 7I6109 Corr Reqd See notes <br /> S:\MMcleod\Crystal\InspectiorRecords.rpt 3I1012011 Page 2 of 6 <br />