Laserfiche WebLink
y-LS-o � <br /> Tony Lee <br /> From: Soojin Kim <br /> Sent: Wednesday, May 28, 2008 8:59 AM <br /> To: Tony Lee; Kirk Brooks <br /> Subject: FW:4-25-08 Popov-findings-order.doc <br /> fyi <br /> From: Ron Riach [mailto:Ron@]RREngr.com] <br /> Sent: Tuesday, May 27, 2008 1:53 PM <br /> To: Soojin Kim <br /> Subject: RE: 4-25-08 Popov -findings-order.doc <br /> Soojin, <br /> At this time the site has been temporarily stabilized by the new contractor to my satisfaction. Survey and geotechnical <br /> professionals have been to the site and provided the information required for civillstructural design.We should be able to <br /> submit a week or two before the 60 days. <br /> Thanks, <br /> Ron Riach,P.E. <br /> JRR Engineering, Inc. <br /> 18609 76th Ave. W., Ste. 6 <br /> Lynnwood, WA 98037-4149 <br /> (425) 697-5108 <br /> Fax (425) 697-4506 <br /> www.JRREn r.com <br /> t <br />