Laserfiche WebLink
� <br /> � t <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> ��Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> � Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiitration system per City of Everett <br /> Storm Manual 3-2.6.2. Width _, Depth _, Length _, <br /> 10. The contractor must meet with the Public Works InsF�ector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11 nstall erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> 13 Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> � 14. Ali excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is aliowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e, all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connectin � <br /> water and sewer services. 9 provisions for this building s <br /> 19. A catch basin as per City Standard Plan #402 with a gss trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system �s to be instalied, the pressure Iine must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFCA <br /> Standards 13D. <br /> P',VCcmmeNs <br /> •� f�� �7L�rii,/�dL� <br />