Laserfiche WebLink
� .. . <br /> G E O TE C H 13256 Nonheast?O�h Stmct,Suiic 16 <br /> Bcllewc,Washingtun 9R(HIS <br /> ' CONSULTANTS, TNC. (425)747-5618 FAX(425)747•856I <br /> July 25, 2000 � <br /> JN 00284 i <br /> Jordan Construction Company CddpQ—O� ( I <br /> 12433 Southeast 89th Place <br /> Newcastle, Washington 98056 � <br /> Attention: Dan Jordan I <br /> Subject: Transmittal Letter—Gaotechnical Engineering Study <br /> Proposed Single-Family Residence <br /> Lot 1, 4931 Glenwood Avenue <br /> Everett, Washington <br /> Dear Mr. Jordan: <br /> We are pleased to present this geotechnical engineering report for a proposed single-family <br /> residence to be constructed on Glenwood Avenue in Everett, Washington. The scope of our work <br /> consisted of exploring site surface and subsurface conditions, and then developing this report to <br /> provide recommendations for general earthwork and design criteria for foundations and retaining <br /> walls. This work was authorized by your acceptance of our proposal, P-5276, dated July 11, 2000. <br /> The subsurface conditions of the proposed building site were explored with twr, test pits thai <br /> encountered a layer of fill overlying medium-dense, weathered slightly silty, gravelly sand overlying <br /> dense glacial till. The dense glacialiy deposited soils were encountered approximately 6 to 7 feet � <br /> below the existing grade. The single-family residential homes can be constructed on conventionai <br /> foundations bearing directly on medium-dense, glacially deposited soils located 4 to 5 feet below <br /> the ground surface, or on imported structural fill or lean-mix (1 1/2 sack) concrete on top of dense <br /> soils. Temporary slope cuts can be excavated at a 1.5:1 (H:V) slope. An old septic sewer system <br /> will need to be removed out of the footprint of the proposed residence. <br /> The attached report contains a discussion of the study and our recommendations. Please contact ;� <br /> us if there are any questions regarding this report, or if we can be of further assistance during the � <br /> design and construction phases of this project. ;� <br /> h <br /> •. <br /> Respectfully submitted, <br /> GEOTECH CONSULTANTS, INC. <br /> �- `"" � � <br /> James R. Finley, P.E. <br /> Principal � <br /> � <br /> SES/JRF: alt <br /> GEOTECH CONSULTANTS,INC. I/� <br />