My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4935 GLENWOOD AVE 2016-01-01 MF Import
>
Address Records
>
GLENWOOD AVE
>
4935
>
4935 GLENWOOD AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 6:35:25 PM
Creation date
2/11/2017 6:35:11 PM
Metadata
Fields
Template:
Address Document
Street Name
GLENWOOD AVE
Street Number
4935
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jordan Ccnstruction JN 00284 <br /> July 25, 2000 Page 6 <br /> to the above lateral soil pressures. Where sloping backfill is desired behind the walls, we will need <br /> to be given the wall dimensions and the slope of the backfill in order to provide the appropriate <br /> design earth pressures. <br /> Heavy construction equipment should not be operated behind retaining walls, foundation walls, and <br /> existing rockeries, within a distance equal to the height of a wall, unless the walls are designed for <br /> the additional lateral pressures resulting from the equipment. The wall design criteria assume that <br /> the backfill will be well-compacted in lifts no thicker than 12 inches. The compaction of backfill near <br /> the walls should be accomplished with hand-operated equipment to prevent the walls from being <br /> overloaded by the liigher soil forces that occur during compaction. <br /> Retaininp Wall Bac�ll <br /> Backfill placed behind retaining or foundation walls should be coarse, free-draining <br /> structural fill containing no organics. This backfill should contain no more than 5 percent silt <br /> or clay particles and have no gravel greater than 4 inches in diameter. The percentage of <br /> particles passing the No. 4 sieve should be between 25 and 70 percent. For increased <br /> protection, drainage composites should be placed along cut slope faces, and the walls <br /> should be backfilled with pervious soil. <br /> The purpose of these backfill requirements is to ensure that the design criteria for a <br /> retaining wall are not exceeded because of a build-up of hydrostatic pressure behind the <br /> wall. The top 12 to 18 inches of the backfill should consist of a compacted, relatively <br /> impermeable soil or topsoil, or the surtace should be paved. The ground surface must also <br /> slope away from backfilled walls to reduce the potential for surface water to percolate into <br /> the backfiil. The sub-section entitled PERMANENT FOUNDATION AND RETAIN/NG <br /> WALLS contains recommendations regarding the placement and compaction of structural <br /> fill behind retaining and foundation walis. <br /> If moist conditions or some seepage through the walls are not acceptable, waterproofing <br /> should be provided. This typically includes limiting cold-joints and wall penetrations, and <br /> using bentonite panels or membranes on the outside of the walls. Applying a thin coat of <br /> asphalt emulsion is not considered waterproofing, but will only help to prevent moisture, <br /> generated from water vapor or capillary action, from seeping through the concrete. <br /> EXCAVATIONS AND SLOPES <br /> Excavation slopes should not exceed the limits specified in local, state, and national government <br /> safety regulations. Temporary cuts to a depth of about 4 feet may be attempted vertically in <br /> unsaturated soil, if there are no indications of slope instability. Vertical cuts should not be made <br /> near property boundaries or existing utilities and structures. Based upon Washington <br /> Administrative Code (WHC) 296, Part N, the soil type at the subject site would be classified as <br /> Type B. Therefore, temporary cut slopes greater than 4 feet in height cannot be excavated at an <br /> inclination steeper than 1:1 (Horizontal:Vertical), extending continuously between the top and the <br /> bottom of a cut. This recommendati�n is for the dense glacial till encountered approximately 6 to 7 <br /> feet below the existing grade. The soil type for the looser weathered and fill soils above the dense <br /> GEOTECH CONSULTANTS,INC. �5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.