Laserfiche WebLink
� J�rdan Construction JN 00284 <br /> July 25, 2000 Page 10 <br /> event subsurtace conditions differ from those anticipated prior to the start of construction. <br /> However, our work would not include the supervision or direction of the actual work of the <br /> contractor and its employees or agents. Also, job and site safety, and dimensional measurements, <br /> will be the responsibility of the contractor. <br /> The following plates are attached to complete this report: <br /> Plate 1 Vicinity Map <br /> Plate 2 Site Exploration Plan <br /> Plate 3 Test Pit Logs <br /> Plate 4 Typical Footing Drain Detail <br /> We appreciate the opportunity to be of service on this project. If you have any questions, or if we <br /> may be of further service, please do not hesitate to contact us. <br /> Respectfully submitted, <br /> GEOTECH CUNSULTANTS, INC. <br /> Scott E. Stevens <br /> Geotechnical Engineer <br /> 4,� oF! <br /> ��w"s�,lF� <br /> '��4 (t, �"'4 <br /> ti � J i � <br /> A <br /> 70� ������0`2�m <br /> �BjaNAL tNG 7/Z�DD <br /> E%WRES 8/��/e / <br /> James R. Finley, P.E. <br /> Principal <br /> SESiJRF: alt <br /> GEOTECH CONSULTANTS, INC. '�� <br />