Laserfiche WebLink
. • <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Pubiic Works approved plan dated <br /> 5. Connect sid?sewer per City Standard #601. <br /> 6. Gnnr,:c� ��c+e s.,wer per City Standard #'s 601, 602, 604. <br /> 7. Connact all rooftop downspouts to the side sewer. <br /> 8. Connect rooRop downspouts to the drainage system provided for this lot. 9 <br /> ---�--.– —--- i <br /> � Rooftop runoff must be discharged to a roof downspoui infiltration system p�reity of-Ever_ett <br /> Storm Manual 3-2.62. Width �, Depth �, Length .�/._. _� <br /> – — <br /> --- _ - <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> �Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales swales, or erosion,blankets. �} S�Lf �Fenee a�oHy -F�,� �r wes-� <br /> sid.. oF�il.c l.o�' w�CL 6a rr,�vircd. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> 13. Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> 14 Ail excavated material from foundation, sidewalk and driveways shall be haul�d to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per Ciry of Everett Standard Plan #'s 305A <br /> & 306 on this prop�sal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17 Pave driveway ' <br /> �t�p -f"o y'q.-,a,>�' dovrt <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system �s to be installed, the pressure line must discharge into a private <br /> manhole, then graviry flow across the public right-of-way. <br /> ( 2y. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> �/ Standards 13D. <br /> fJ v'c�o••��„-�, �aCL �c�.lC 6e re�vi�e� aLorf f6< ts wes� Paopeh� <br /> Li��c in or�r. fo ��en fl�e 9��'ac� �'o� �fhc p�ir,Ein� and/�1�vrn ��ovNc� <br /> PWComm�!S WaCL roh ro� 6c over 3� �i:,sb irr t�•���h�- -+��e 7'i/'SF ,j��•pM <br /> f/,� pro����]/ C,•i�e , �/iJ cvall will r��.v�rP �.P�rova l d- j��-�;t <br /> f'�o�r �c bv,lo;�S d��_ �4. rot�fEr-ry wilC h� �L <br /> be ad��uQf� to .s���a.-f �h� �CL d" �c./,.c�c Su.c%a�� �OYP_r� <br />