My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5506 GLENWOOD AVE 2016-01-01 MF Import
>
Address Records
>
GLENWOOD AVE
>
5506
>
5506 GLENWOOD AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 7:08:30 PM
Creation date
2/11/2017 7:08:22 PM
Metadata
Fields
Template:
Address Document
Street Name
GLENWOOD AVE
Street Number
5506
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CLOSED CK 1POR1C ORDBRB REPORT <br /> Total Utility Maintenance Manaqement System <br /> 02/07/1997 Page 1 <br /> �---'-mcvs=�eeecvr-cv==ev—xveevcoer=cc`-=ve--=---------vvoce=ev'-------�ss <br /> ___�_ _________ ________ <br /> Date Ranqe :01/09/1989 - O1/31/1997 <br /> CM Work Order Ranqe :1001091070001 - UT2600-02- Pattern :7101196750981 <br /> Item Range :<Slank> - WW22020001 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> =---___----------------------------------------------------------------- <br /> CM WORK ORDER ID: 7101196750981 Title: CONVERT 5506 GLENWOOD AVE <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS0184F001 -- WATER SERVICE <br /> Location ID: -- <br /> Program 710 Function 119 Activity 675 <br /> Date Completad: O1/17/].997 <br /> Overall Craft: <br /> Issued: O1/09/1997 Issued by: WMW Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Readinq: <br /> Downtime: 0 hours <br /> status: <br /> I+abor: ' <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> UL CSG CAVANAH, SHANE G. 0.00 7. 00 94.36 <br /> WST WDT WALDEN, DARGLD T. 0.00 7. 00 147.63 <br /> Total Labor Cost: 241.99 <br /> ltat�rials: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> BOX000065547 BOX METER CONC W/STEEL LID O1/10/1997 1 41.14 <br /> COUP34142747 COUPLING 3/4" CTS COMP X MIPT@ O1/10/1997 1 4.OA <br /> ELL�34104247 ELL 3/4" 90 DEG STREET BRASS " O1/10/1997 1 1.51 <br /> METE3G089447 METER 5/8" X 3/4" NEPTUNE T-10 O1/10/1997 1 30.67 <br /> NIPP34131247 NIPPLE 3/4" CIASE HRASS " O1/10/1997 1 0.79 <br /> SETT34033647 SETTER COP 5/8�� X 3/4° (H12") O1/10/1997 1 52.32 <br /> Total Material Cost: 30.51 <br /> Vehiclea: <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V2117 91 CHEV 1-TON HYD UNIT 7.00 37. 10 <br /> Total Vehicle Cost: 37 . 10 <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br /> METER #41908454. <br /> Total cost for work order 7101196750981: 409. 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.