Laserfiche WebLink
- r <br /> Landscaping, Inc. � <br /> SITE DEVELOPMENT CONTRACTnORSSt 8, 1980 <br /> 5409 IBOth S.E.,90THElL,WA.98017,(2061465�y� <br /> � Gerry Ervine <br /> City of Everett <br /> 3002 Wetmore <br /> Everett, Wa. 98201 <br /> • Re: Harrtany 4111 Unity Church <br /> Dear Gerry: <br /> • As per our telephone conversation August 8, at 9:30 a.m. , we have run <br /> � into soils and hydraulic problems on the Unity Church site. These have <br /> created a need for some changes in the approved site plan. It is not <br /> feasible to place the driveways as we originally planned. Me have found few <br /> places along Glennwood where soil stability will allow a driveway without <br /> extensive coreing of existing peat and importing pit run, in addition to <br /> providing a network of permanent drainage lines. We plan to utilize the <br /> existing curb cut on Glennwood, as this location provides a good load bearing <br /> access point. • <br /> � From the traffic standpoint, this 'ocation woula work as well as the former <br /> location. We would maintain an aesthet�cally pleas��g serpentine entrance <br /> as planned. Treatment of the creek will remain the s�me and the chanoe will <br /> not adversely affect it. The actual lo�ation would be moved 380 feet down <br /> Glennwood. <br /> We also have found that the existing knoll u the site with six 30-feet <br /> cedar trees on it is presenting an obstacle to good design and economic <br /> realization of the site plan. We propose to remove the tree and part of the <br /> knoll . We are prepared to replace the existing trees on a one for one basis. <br /> The trees would be a minimum of 2" caliper in size, and healthy native stock. <br /> As should be evident by the approved site plan we intend to provide a thorough <br /> landscape job on this site. <br /> Lastly, due to these changes, a reorientation of the building is appropriate <br /> to best appreciate the site. This would also allow us to save one existing <br /> mature cedar tree at the �outh end. The building would be reorientated <br /> approximately 30°. <br /> These changes are all intended to make the site a better one all around <br /> and save problems in the future. �hP intent and basic desi9n of the approved <br /> site plan has not changed. <br /> Thank you for your help in this matter. _ <br /> Vei,v truly your , <br /> � � � NOSCAPING, N . � <br /> 1 <br /> , <br /> ��� �- � <br /> � ' , _� i �� T iason <br /> ��= "" _ �,.�71v'` � Sit Planner <br /> i <br />