My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2815 FULTON ST A & B 2016-01-01 MF Import
>
Address Records
>
FULTON ST
>
2815
>
2815 FULTON ST A & B 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2017 7:04:54 AM
Creation date
2/11/2017 9:26:19 PM
Metadata
Fields
Template:
Address Document
Street Name
FULTON ST
Street Number
2815
Unit
A & B
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; r <br /> r � � <br /> - � <br /> PUBLIC WORKS PERMIT COMMENTS i <br /> 4. As per Public Works approved plan dated <br /> �� Connect side sewer per City Standard #601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> � <br /> ' 7 Connect all rooftop downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged :o a roof downspout infiltration system per City of Everelt <br /> Storm Manual 3-2.6.2. Width,_.. Depth _, Length,_ � <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11 Install erosion control measures as determined by the Public Worics inspector, such �� silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> 13 Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> � appro ed,tpermitted site�No wasiing of materiakis a�llowed onYth shbui de galotd to an <br /> 15. Remove and replace curb, gutter and sidewaik as per City of Everett Standard Plan#'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector(i.e. all unused <br /> driveways and any broken or damaged area must be replaced). ' <br /> 16. Install a Type I concrete driveway per City of Everett Standarti#307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan#402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across ihe public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> PWComments 2/� <br />
The URL can be used to link to this page
Your browser does not support the video tag.