My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4620 COLLEGE AVE 2016-01-01 MF Import
>
Address Records
>
COLLEGE AVE
>
4620
>
4620 COLLEGE AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 9:59:46 PM
Creation date
2/11/2017 9:59:42 PM
Metadata
Fields
Template:
Address Document
Street Name
COLLEGE AVE
Street Number
4620
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 1 <br /> e/zs/zoiz is:ia <br /> ISSUEd By AGA AHLES,GREGORY A. <br /> Issued Department aw FUBLIC WORKS <br /> Date Issi�-�d s�tai2o�z <br /> Fund 4ot Account s Program »o Function �oe Activity 875 <br /> Program <br /> Title REPLACE 4620 COLLEGE AVE 710709675 <br /> Work Order No 20120687 Project Activity Type CORRECTIVE MAINTENANCE Status c� <br /> Status snena�z Time oe•oo Original WU Billing <br /> Customer Informatfon <br /> Customer�i�me Customer ld <br /> Address 4820 Street co��ece nve <br /> Apartment No City <br /> State Z'P <br /> Subdivision Change Map Y/N <br /> Phone No ( 1 • Ext <br /> Second Phone ( ) • Ext <br /> E-Maii Address <br /> Problem Information <br /> Address 4620 Street COLLEGEAVE <br /> From Cross Street <br /> To Cross Street <br /> City Zip <br /> Subdivision Map Book Map Reference <br /> Problem SEWER SEWER <br /> Sub Problem SS SIDE SEWER <br /> Requested By RMA REQUA,MARCUS A. D8f8 R8Q�8S�2d <br /> Agency Related Request <br /> Initiated From <br /> Utiliry Locate (USA) No 12087283 Called Date Expiration Date <br /> Assignment Information <br /> Dept Pw PUBLIC WORKS Priority Estimated Hou�s <br /> Cf2'JJ SCONST SEWER CONSTRUCTION(AHLES) <br /> Contractor <br /> Assigned To IJM IMHOF,JAMES M. <br /> Assigned By A�A AHLES,GREGORY A. <br /> Assigned Date To Be Comp Date <br /> Scheduled Date Scheduled Time <br /> Route Route Sequence <br /> Comments <br /> Action Taken RERPLACED 9 FT OF 8"CONCRETE TO MAIN WITH 8"PVC.CONNECTED 2 SIDE SEWERS FROM <br /> PROPERTY LINES TO MAIN AND INSTALLED CLEANOUTS AT PROPERTY LINE FOR BOTH A820 <br /> COLLEGE CONNECTED TO 4"CONCRETE AT PL.4617 FOWLER CONNECTED TO 8"CONCRETE AT <br /> PL.INSTALLED METAL ON CLEANOUT CAPS.COMPACTED AND GREADED ALLEY TO EXISTING. <br /> R8COrt1I11@�d8d ACQIOII REPLACE SIDE SEWER <br />
The URL can be used to link to this page
Your browser does not support the video tag.