Laserfiche WebLink
everett INSPECTION REPORT <br /> � Address ����rr_ !/A� �/P <br /> Contractor <br /> ,a <br /> �/`�U� �Q � M Owner Jlrn� c h <br /> Date �Z� �"�� <br /> TY�E OF INSPECTION REQUESTED <br /> r` BLDG: Pmt. No. ❑ MECH: Pmt. No. <br /> ��,ELEC: PmL No. 7��Q] ❑ PLBG: PmL No. <br /> ❑Temp. Eiect. ❑ Framing ❑ Gas Piping <br /> ❑ Footing ❑ Drywall, Nailing �Consultation <br /> ❑ Foundation ❑ Shear Nailing ❑Groundwork <br /> ❑ Ductwork .Grid O�St�r�t.Slab <br /> ❑Waod Stove Rough-In <br /> � Masunry Service ❑ <br /> PPROVAL ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION ❑ CORRECTION REQUIRED =" <br /> ,` <br /> ❑ Corrections listed below MUST BE MADE before work can be approved. . <br /> ❑ Please contact inspector and arrange for appointment. <br /> ❑Was not able to peAorm inspection. <br /> ❑ CALL 259-8810 FOR REINSPECTIUN —24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> � <br /> f=G ` <br /> Inspector <br /> y � Date <br />