My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004 COLUMBIA AVE 2016-01-01 MF Import
>
Address Records
>
COLUMBIA AVE
>
2004
>
2004 COLUMBIA AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 10:35:02 PM
Creation date
2/11/2017 10:34:47 PM
Metadata
Fields
Template:
Address Document
Street Name
COLUMBIA AVE
Street Number
2004
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC 4VORKS PE!?MIT COMMENTS <br /> 4. Connect side sewer per City Standard #601. <br /> 5. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 6. Connect all rooftop do�vnspouls to Ihe side sewer. <br /> 7. Connect rooflop downspouts to the drainage system provided for this loc. <br /> 8. Roo(top runoff must be discharged to a ruof downspout .��filtration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25' long. See attachment for <br /> more details. <br /> � The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning tlie project. <br /> 10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosicn blankeis. <br /> .�`_�. <br /> C( 1 L � Install erosion con�rol measures per City o(Everett Standards for small parceis <br /> 12. Remove erosion control measures upon completion of the project prior to finat approval of the permit. <br /> (13. � All excavated materiai from foundation, sidewalk and drive•Nays shall be hauled to an approved, <br /> — permitled site. No wasling of material is allowed on this building lot. <br /> `�(`a ,`� No dirt, mud, rocks or debris lo be tracked onlo roadway. <br /> 15. No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedestrian travel. <br /> 16. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and repiace curb, gutler and sidewalk as per City of Everett Standard Plan #'s 305A 8 306 on <br /> tliis proposal's frontage as directed hy the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everett Standar� #307. <br /> 19. Pave driveway from the front property line out to the street pavin�. <br /> 20. Contact lhe Waler Dislrict for connecting pro�isions for this building's wafer and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan ik02 with a gas trap per Standard Plan tJ410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, lhen <br /> aravily flow across the public ric�ht-of-way. <br /> 23. A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> FOR PUBLIC WORKS INSPECTION, CALL RANDY AT 425-339-7403 /CLIFF AT 425339-7404 <br /> FCrcanm,nts Z(� <br />
The URL can be used to link to this page
Your browser does not support the video tag.