My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2319 COLUMBIA AVE 2016-01-01 MF Import
>
Address Records
>
COLUMBIA AVE
>
2319
>
2319 COLUMBIA AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 11:00:13 PM
Creation date
2/11/2017 10:59:52 PM
Metadata
Fields
Template:
Address Document
Street Name
COLUMBIA AVE
Street Number
2319
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � � PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> �/ <br /> (✓.l Connect side sewer per City Standard #'s 601, 602, 604. <br /> 6. Connect all rooftop downspouls to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 8. Rooftop runoff must be discharged t� a roof dnwnspout infiltration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br /> more details. <br /> 9. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the project. Call Randv Allen at 425-339-7403 // Call Cliff Lindman at 425-339-7404. <br /> 10.� Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> ��111 Install erosion control measures per City ot Everett Standards for small parcels <br /> % <br /> � Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> /1$\ All excavated r-iaterial trom foundation, sidewalk and driveways shall be hauled to an approved, permitted <br /> �� site. No wasting oF inaterial is allowed on this buildino lot. <br /> i,_ ,�� <br /> '1� No dirt, mud, rocks or debris lo be iracked onto roadwaY�d;�' ./ <br /> 15. No building materials to be stacked on sidewalklroadway and sidewalk/roadway to be kept clean and <br /> open tor pedestrian travel. <br /> 16. Adjust water meter box 1" above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City oi Everett Standard Plan #'s 305A 8 306 on <br /> this proposal's irontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrele driveway per City of Everett Standard #307. <br /> 19. Pave driveway (rom the front property line out lo the streel paving. <br /> 20. Pave to existing paving in alley. <br /> 21. Contact the Water District for connecting provisions for lhis buildmg's water and <br /> sewer services. <br /> 22. A catch basin as per City Standard Pian #402 with a gas trap per Standard Plan #410 is required for the <br /> parking area. <br /> 23. If a sewer pump system is lo be installed, the pressure line must discharge inlo a privale manhole, then <br /> graviry flow across the public right-of-way. <br /> 24. A sprinkler system is required for this building in compliance with lhe requirements of NFPA Standards <br /> 13D. <br /> Your Public Works Inspector is Cliff Lindman. Call him at 425-339-7404 For questions and inspections <br /> PWCommenls I Revised 618111 �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.