My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2502 COLUMBIA AVE 2016-01-01 MF Import
>
Address Records
>
COLUMBIA AVE
>
2502
>
2502 COLUMBIA AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 11:05:22 PM
Creation date
2/11/2017 11:05:11 PM
Metadata
Fields
Template:
Address Document
Street Name
COLUMBIA AVE
Street Number
2502
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, � <br /> PUBLIC WORKS PERMIT COMMENTS , <br /> 4. Contact the Public Works Inspector(call )to discuss the project prior to beginning work. <br /> q. Connect side sewer per City Standard#fi01. <br /> � Connect side sewer per City Standard#'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> 7, Connect rooftop downspouts lo lhe drainage system provided for this lot. <br /> g. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> /g � <br /> ,7 The contractor must meet wilh lhe Public Works Inspector to discuss potential drainage routing <br /> �� prior to beginning the project. <br /> 10. Install erosion conlrol measures as determined by the Public Works inspector, such as silt fence, <br /> straw bales, swales, or erosion blankets. <br /> f 11.� Install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> �13�l Ail excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> �_ permitted site. No wasting of material is allowed on this building lot. <br /> ���% No dirt, mud, rocks or debris to be tracked onto roadway. <br /> j�' ' No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean <br /> and open for pedestrian travel. <br /> 16. Adjust water meter box 1" above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewaik as per City of Everelt Standard Plan#'s 305A 8 <br /> 306 on this proposal's frontage as directed by the Public Works Inspector(i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 18. Install a Type I concrele driveway per City of Everett Standard #307. <br /> ��9'.�,� Pave driveway from lhe front property line out to the slreet paving. <br /> 20. Contact the _Water District for connecting provisions for this building's water <br /> and sewer services. <br /> 21. A catch basin as per City Standard Pian#402 with a gas trap per Standard Plan#410 is required <br /> for lhe parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhoie, then gravity flow across the public right-of-way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.