Laserfiche WebLink
CLOSED QI WORK ORDERS RSPORT <br /> Total Utility Maintenance Management System <br /> ___________________________________05/29/199�'===_'__------ -_-________--=____- <br /> Page 1 <br /> Date Range :O1/09/1989 - 05/20/1996 - _ - <br /> CM Work Order Range :1001091070001 - UT1002- <br /> Item Ranqe :<Blank> - WWZ2020001 - Pattern :7101196750709 <br /> Program ALL Function ALL Pattern :* <br /> Activity AI,L <br /> --------__=___________________=_________=__________------ <br /> �M W�RK ORDER ID: 7101196750709 Title: REPAIR 6916 COLUMBIA CT ~ � <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS0885C052 -- WATER SERVICE <br /> Location ID: __ <br /> Program 710 Function 119 <br /> Date Completed: 05/17/1996 Activity 675 <br /> , Overall Craft: I <br /> Issued: 05/17/1996 Issued by: W�T <br /> Out of Service? NO Priorit • Assigned to: <br /> Meter Reading: Y' Travel Time: 0.0o Hr. <br /> Downtime: 0 hours <br /> " status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ---- ------ ----------------- <br /> ------------- ----------- <br /> UL SSJ SMITH, STEVE J. -------'-- <br /> WST WDT WAI,DEN, DAROLD T. �•00 3.00 44.73 <br /> 0.00 3 .00 59,76 <br /> Total Labor Cost: 104.49 <br /> � Katerials: <br /> ID Description <br /> ------------ ---------------- - Date # Used Cost <br /> ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITE@ 05 17 1996 <br /> / '/-- -------i <br /> BOX000056247 BOX METER PLA 15�� X 10° W/LID 05/17/1996 4 30.72 <br /> COUP34142747 COUPLING 3/4" CTS COMP X MIPT@ O5/17/1996 1 12.96 <br /> ELL034101447 ELL 3/4" 90 DEG BRASS � 4.15 <br /> ELL034104247 ELL 3/4" 90 DEG STREET BRASS ^ 05/17/1996 i 1.35 <br /> N/A METER JUMPER (FROM STOCK) 05/17/1996 1 1.76 <br /> PIPE34060647 PIpE 3/4" POLY I.p,S. 0.00 <br /> SETT34149747 SETTER COP 5/8'� X 3/4" (H7" O5/17/1996 5 1.20 <br /> ) / / 1 42.74 <br /> Total Material Cost: 94,88 • <br /> Vehicles: <br /> ID Description <br /> --__________ Hours Cost <br /> ---------------------- <br /> -------- ------ <br /> V2117 91 CHEV 1-TON HYD UNIT <br /> 3.00 16.80 <br /> Total Vehicle Cost: V 16.80 <br /> Total cost for work order 7101196750709; ------" <br /> 216.17 <br />