Laserfiche WebLink
CLOSED CM SVORR ORDERS RfiPORT <br /> Total Utility Maintenance Management System page L <br /> OB/24/1998 <br /> Date Rarge :06/7.4/1900 - 08/24/1998 i <br /> CM Work Order Range :0810800810001 - UT283�-30-322Pattern :?101196751346 <br /> Item Range :<Blank> - W�1L3694L05 <br /> Pattern :* ' <br /> Program ALL Function ALL Activity ALL <br /> CM WORK ORDER ID: 7101196751346 Titlea REPLACE 5607 COMMERCIAL AVE <br /> «DUPLICATE PRINTING OF THIS WORK OI2DER» <br /> Item ID: WSOSBSF013 -- WATER SERVICE <br /> Location ID: �- Activity 675 <br /> Program 710 Function 119 <br /> Date CompJ.eted: 08/24/1998 <br /> Overall Craft : Issued by: WMW Assigned to: <br /> Issued: O1/06/1998 Travel Time: Q . 00 Hr. <br /> Out of Service? NO Priority: <br /> Mete�' Reading: <br /> Downtime: 0 hour� <br /> Status: <br /> Labor: planned Hrs Actual Hrs Cost <br /> Craft ID Name ----- ---'- <br /> ----------- <br /> ---------- <br /> ----------------------- 58 . 04 <br /> ----- ---- <br /> -"'--- 0 .00 4 .00 <br /> UL CSG CAVANAH, SHANE G. 0 . 00 4 .00 87 . 16 <br /> WST WDT WALDEN, DAROLD T. __-------- <br /> Total Labor Cost : 145 .20 <br /> Materials: Date # Used Cost <br /> ID Description ---- ------ <br /> -------- <br /> ---- -------- 2 16 . 86 <br /> ADAP34000547 ADAPTER 3/4" MIP X SNSTA-TITEC O1/OB/1998 2 16 . 86 <br /> ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITEQ O1/OB/1998 z 15.42 <br /> ADAP34000647 ADAPTER 3/4" FIP X INSTA-TITE� O1/OB/1998 1 44 . 94 <br /> BOX000065547 BOX METER CONC W/STEEL LT_D O1/08/1996 z 3 ,24 <br /> ELL034104247 ELL 3/4" 90 DEG STREET BRASS � O1/08/1998 1 0 . 1? <br /> PIPE34060647 PIPE 3/4" POLY I •P•S • O1/08/1998 1 38 . 65 <br /> SETT34149747 SETTER COP 5/8" X 3/4" �H7") ____---- -- <br /> Total Material Cost : 136 . 16 <br /> Vehicles: Aours Cost ; <br /> ID Description ______ __________ i <br /> ------------------------------ 4 . 00 20 . 80 ' <br /> V2117 91 CHEV 1-TON HYD UNIT 4 . 00 99 . 60 <br /> VH0003 94 CAT BACKHOE __________ <br /> Total Vehicle Cost : 120 .40 <br /> 401 .76 <br /> Total cost for work order 7101196751346 : <br /> !� <br /> � <br />