Laserfiche WebLink
'Tim Tyler _ <br /> _ <br /> From: Tim Tyler <br /> Sent: Tuesday, January 19, 1999 9:42 AM <br /> To: Mike Weight <br /> Subject: French garage <br /> In response to the latest letter staH provided the foltowing; <br /> 2/3/98 Steve Inglesbee [Planningj and Jeff Heilman [Building]made an inspeclion of the project. <br /> The contractor was present as was an emplayee of the contractor. <br /> Using the lower edge of lhe siding on the existing house as the reference point �as directed by <br /> planning staff] a measurement was made of the building height using a steel tape measure. <br /> The method used was to measure the floor to ceiling height of each floor and then to measure <br /> each floor system thickness. The combined measurements totaled 22 inches more than the <br /> allowable height. <br /> The contractor w+:is fnfortned of this and instructed to refrain form installing the roof sheathing <br /> until the issue was res�lved with the owner. <br />