Laserfiche WebLink
� <br /> PUBLIC WORKS PERMIT Date: 5/17/2012 <br /> Public Works Permit#: P1h'1205-020 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Buildin,q Permit#; CW1204-003 <br /> t Everett, WA 98201 Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee$: $ 25.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> JOSEPH CRUPI <br /> PO BOX 623 <br /> LYNNWOOD WA 98046 <br /> PHONE: 2069191076 PHONE: <br /> TAX PARCEL ID# SITE ADDRESS: 6G15 COMMERCIAL AVE <br /> DESCRIPTION OF PROPOSED WORK: <br /> BASEMENT, FOUNDATION 8 GARAGE <br /> PER!11T CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance��+ith the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Undergrourd Service 4ii hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 5. No dirt, mud, rocks or debris to be tracked onto roadway. W <br /> 6. Pave new driveway. E.,� <br /> 7. Change garage in the back to storage shed. i,.,.i <br /> 8. Your inspector will be Randy Allen. Call him directly to schedule your inspection at 425-339-7403. � <br /> � <br /> ►'� <br /> � <br /> � Srued � <br /> s -zr -c2 Cw <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless lhe City oi Everetl from any and all claims for <br /> / damages,costs,e•nenses, or causes of aclicn that may arise <br /> because of instaltation and maintenance of thu improvement <br /> ��. ��L or other right-cf-way use hereto applied for and fuAher agrees <br /> to remove same upo�not�:e from the City and to replace <br /> p v d r C nstf , ate public`�roperty dam.,�ed thercby. <br /> � �2�� �2— � / �� _ Z <br /> r .�AL INSPE ION Date �-�''`�'" � ��� I <br /> Approved as Constructed Signalure of Applicant Date <br /> WORK AUTHORIZED BY'fHIS PERMIT'MUST BE S�'ARTED WITFiIN 180 DAYS OF DATE PERMR IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLE110N. TH(S PERMR MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROIECf OVER 90 DAYS DURATION. <br />