Laserfiche WebLink
APPENDIX B <br /> REPORT LIMITATIONS AND GUIDELINES FOR USE' <br /> �� This appendix pro��ides information to help you manage your risks with respect to the use of this report. <br /> GEOTECHNICAL SERVICES ARE PERFORMED FOR SPtCIFIC PURPOSES, PERSONS AND <br /> PROJECTS <br /> This report has been prepared for the exclusive use of Bayside Marine and their authorizcd agents. This <br /> report is not intended for use by others, and the informatiun contained herein is not applicable to other <br /> sites. <br /> � GeoEnginecrs structures our services to meet the specific needs of our clients. For example, a <br /> � geotechnical or geologic study conducted for a civil engineer or architect may not fulfill the needs of a <br /> conslruction contractor or even another civil engineer or architect that are involved in the same project. <br /> Bccause each gcotechnical or geologic study is unique, each geotechnical engineering or geologic rcport <br /> i, is unique, prepared solely for the specific client and project site. Our report is prepared for the exclusive <br /> use of our Clicnt. No other party may rely on the product of our services unless we agree in advance to <br /> � such reliance in writing. This is to provide our firm with reasonable protection against open-ended <br /> liabiliry claims by third parties with whom there would otherwise be no conRactual limits to their actions. <br /> �Vithin the limimtions of scope, schedule and budget, our services have been executed in accordance with <br /> our Agreement ��ith the Client and generally accepted geotechnical practices in this area at the time this <br /> ireport was prepared. This report should not be applied for any purpose or project except the one <br /> originally contemplated. <br /> IA GEOTECHNICAL ENGINEERING OR GEOLOGIC REPORT IS BASED ON A UNI�UE SET OF <br /> PROJECT-SPECIFIC FACTORS <br /> I This report has been prepared for the proposed Bayside Marine project located in Everett, Washiugton. <br /> GcoLnginecrc censidered a number of unique, project-specific factors when establishing Ilie scope of <br /> services for this projcc[ and report. Unless GeoEngineers spcciftcally indicates othenvise, do not rely on <br /> this report if it was: <br /> • not prepared for you, <br /> • not prepared for your project, <br /> • not prepared for the specific site esplorcd, or <br /> • completed Uefore important project changes were made. <br /> For example, changes that can affect the applicability of this report include those that affecr. <br /> • the function of the proposed structure; <br /> • elcvation,configuration, location, orientation or weight of the proposed skvcture; <br /> • composition of the design team; or <br /> • project ownership. <br /> � Dcvclopcd bascd on matcrial providcd by ASFE,Profcssion¢I Firms Practicing;n thc Geoscirnccs;www.asfc.org. <br /> h�fc No. l:6S?-00/-00 Page B-1 (�iEOENGINEER� <br /> IKovrn:Gcr6,1006 <br />