|
� �r._..
<br /> � i�.y.:i.. , ..
<br /> List of Provided Geotechnical Reports
<br /> *Progress Rcport, Soils Investigation, Proposed Dredged Piil and Buikh�ad, E��crctt,
<br /> 1Vashington. Dames & Moore, Junc 9, 1969.
<br /> Report ofSoils Investigation, 12th Street Barge Channel, Gverett, N'ashington. Dames �C
<br /> Moore, December 21, 1972.
<br /> Report of Soils Im�cstigation, Proposed Bargc Loading Pacility and Adjacent Yard Area,
<br /> Gvcrctt, \Vashington. Damcs & Moore, January 20, 1975.
<br /> Soils Investigation, Proposed Dike and I-Iydraulic Pill, Port of Everett [3oat Launching
<br /> Facility, �verett, Nashington. Rogcr Lowe Associates, September 2G, 1975.
<br /> Report, Soils Investigation, Proposed Norton Avenuc Temiinal, Everett, �'Vashington.
<br /> Roger Lowe Associates, November 30, 1977.
<br /> Gcotcchnical Gngineering SWdy, Pionecr Marinc Plaza, West Marine View Drive and
<br /> Marina Access Road, Gvcrett, Washington. Earth Consultants 6�c., January 25, I958.
<br /> Preliminary Environmental Site Assessmcnt, Pioneer Marine Plaza, Ncst Marine Vie�v
<br /> Drive, Everett, 1Vashington. Earth Consultnnts Inc., Novembcr 30, 1959.
<br /> Gcotechnical �ngineering Design Study, Proposed MSRC Facility, Everett, Washineton.
<br /> E-Iart Crowser, Novembcr G, 1992.
<br /> *Report of Geotechnical Investigation, Port of Everett, Nenh Marina Bulkhead, Everett,
<br /> 1'Vashington. URS Corporation, DecemUer 30, 2002.
<br /> *Final Gcotcchnical Lnginecring Study, lZtli Strect Afarina, Pori of E��crctt, R'ashington.
<br /> E[art Crowser, Decembcr 3, 2003.
<br /> ',\lost uscCul rcports (ur our cv�luation
<br /> 7/r
<br />
|