Laserfiche WebLink
PUBLIC WORKS PERMIT Date: 7/8/2011 <br /> r Public Works Permit#: PW1107-002 <br /> Ciry of Everett Public Works Department <br /> ��y 3200 Cedar Street Building Permit#; <br /> Everett, WA 98201 Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee$: $ 11,570.93 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> PORT OF EVERETT CHRIS WEIST <br /> PO BOY,538 <br /> EVERETT WA 98206 <br /> PHONE: 4252593164 PHONE: 2066241387 <br /> TAX PARCEL ID# ' " SITE ADDRESS: 1Z05 CRAFTSMAN WY <br /> DESCRIPTION OF PROPOSED WORK: <br /> BOATYARD EXPANSION&SOIL CLEANUP <br /> Zc� , 23`�� ��t9� �� — <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construc±ion Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 871 <br /> 4. CONSTRUCT PER APPROVED PLAN. <br /> H <br /> H <br /> � <br /> 0 <br /> h <br /> p C�C�C��J� H <br /> , D � <br /> NO a 2 8 2011 Q <br /> CITY UF [VF:RE i f <br /> a <br /> P�rmit i��vic�s <br /> _.... _s-- <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save hartnless the City of Everelt from any and all claims for <br /> damages,cosls,expenses,or causes of adion that may arise <br /> because of installation and maintenance nf fhe improvement <br /> �/ f� ��� or olher right-of-way use hereto applied for and further agrees <br /> lo remove sam�upon notice from lhe City and lo replace <br /> pp e o� on �D/at public propeny damaged thereby. <br /> ?—��� �Z- :� \1 ( � `1�•2tii(�� <br /> FINAL INSP TION Date ' -�4_ ' � <br /> Approved as Constructed Signature of Applicant Date <br /> 1NORK AUTHORIZED 8Y THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND T}iEREAFfER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLEfION. THIS PERMR MAY BE CANCELLED BY THE CffY UPON ANY STOPPAGE OF WORK ON iHIS PROJECT OVER 90 DAYS WRATIOhL <br />