Laserfiche WebLink
/ SECTION 02510 <br /> PORT OF EVERETT <br /> NORTH MARINA REDEVELOPMENT WATER DISTRIBUTION <br /> SHALLOR'SOIL VCP CLEANUP ACTION <br /> LOG DELIVERI',STORAGF_,HND H.°.NDLING <br /> A. Handle pipe, 5ttings,and specials to cnsure delivery to site and final installation <br /> in undarnaged condition. Do not damage pipe coaring and Gning. Keep pipe <br /> dean. Load and unload pipe and fittings using hoists in a mannec to avoid shock <br /> oc damage. Do not drop, sl:id,oc ioll pipe against other pipe. Repair any part of <br /> datnaged coaring or lining. 5cparate zejected pipe immediarely from undamaged <br /> pipe. Remove rejected pipe from site wechin 24 houcs. <br /> 1.07 SEQUENCING AND SCHEDULTNG <br /> A. Provide the Port with pcoposed work schedule pcior to commencing <br /> consuucrion. <br /> B. Notify Ciry of Everett and Engineer 72 houis prioc to mal:ing connecrions to <br /> exisring mains. <br /> C. Norify che Po:t 48 6ours prioc to mal:ing connecrions to e�cisting service line. <br /> D. NoriEy Port of service shutdown. Provide notification at leasc 48 hours prior to <br /> discontinuation of scrvice,induding estimatcd duration of shutdown. <br /> �, Advise Pire Mazshal and the Porc of proposed wattc shucoff that will affecc <br /> hydrants, Eue sprinl:ler rystcros, float fice piocection systems,and alazm sysrems. <br /> F. bfainuin water s}'srems in azcas of sire ro be occupicd and remain in opecauon <br /> during conscrucdon. <br /> PART2—PRODUCTS <br /> 2.01 GENERAL <br /> A. Comply wich Ciq�of L-.ve�ett Standards. <br /> B, Comply with�X�SDOT Standard Spccificarions. <br /> 2.02 I'IPE AND FITTINGS <br /> A. Ducale Iron Pipc: <br /> 1. Ductile Iron Pipe:Centrifugal cast in 18-foot nominal lengt:�s <br /> confocming to A\��UA Ci51;cement-mortar Gned confocming to <br /> oasio-a �ONTRACT RECORD <br /> DOCUMENT <br />