My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1205 CRAFTSMAN WAY PORT INFRASTRUCTURE 2016-01-01 MF Import
>
Address Records
>
CRAFTSMAN WAY
>
1205
>
PORT INFRASTRUCTURE
>
1205 CRAFTSMAN WAY PORT INFRASTRUCTURE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 12:53:14 AM
Creation date
2/12/2017 12:52:51 AM
Metadata
Fields
Template:
Address Document
Street Name
CRAFTSMAN WAY
Street Number
1205
Tenant Name
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ SECTION 02510 <br /> PORT OF EVERETT <br /> NORTH MARINA REDEVELOPMENT WATER DISTRIBUTION <br /> SHALLOR'SOIL VCP CLEANUP ACTION <br /> LOG DELIVERI',STORAGF_,HND H.°.NDLING <br /> A. Handle pipe, 5ttings,and specials to cnsure delivery to site and final installation <br /> in undarnaged condition. Do not damage pipe coaring and Gning. Keep pipe <br /> dean. Load and unload pipe and fittings using hoists in a mannec to avoid shock <br /> oc damage. Do not drop, sl:id,oc ioll pipe against other pipe. Repair any part of <br /> datnaged coaring or lining. 5cparate zejected pipe immediarely from undamaged <br /> pipe. Remove rejected pipe from site wechin 24 houcs. <br /> 1.07 SEQUENCING AND SCHEDULTNG <br /> A. Provide the Port with pcoposed work schedule pcior to commencing <br /> consuucrion. <br /> B. Notify Ciry of Everett and Engineer 72 houis prioc to mal:ing connecrions to <br /> exisring mains. <br /> C. Norify che Po:t 48 6ours prioc to mal:ing connecrions to e�cisting service line. <br /> D. NoriEy Port of service shutdown. Provide notification at leasc 48 hours prior to <br /> discontinuation of scrvice,induding estimatcd duration of shutdown. <br /> �, Advise Pire Mazshal and the Porc of proposed wattc shucoff that will affecc <br /> hydrants, Eue sprinl:ler rystcros, float fice piocection systems,and alazm sysrems. <br /> F. bfainuin water s}'srems in azcas of sire ro be occupicd and remain in opecauon <br /> during conscrucdon. <br /> PART2—PRODUCTS <br /> 2.01 GENERAL <br /> A. Comply wich Ciq�of L-.ve�ett Standards. <br /> B, Comply with�X�SDOT Standard Spccificarions. <br /> 2.02 I'IPE AND FITTINGS <br /> A. Ducale Iron Pipc: <br /> 1. Ductile Iron Pipe:Centrifugal cast in 18-foot nominal lengt:�s <br /> confocming to A\��UA Ci51;cement-mortar Gned confocming to <br /> oasio-a �ONTRACT RECORD <br /> DOCUMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.