My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1205 CRAFTSMAN WAY PORT INFRASTRUCTURE 2016-01-01 MF Import
>
Address Records
>
CRAFTSMAN WAY
>
1205
>
PORT INFRASTRUCTURE
>
1205 CRAFTSMAN WAY PORT INFRASTRUCTURE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 12:53:14 AM
Creation date
2/12/2017 12:52:51 AM
Metadata
Fields
Template:
Address Document
Street Name
CRAFTSMAN WAY
Street Number
1205
Tenant Name
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT SECTION O:S10 <br /> NORTH MARINA REDEVELOPMENT WATER DISTRIBUTION <br /> SHALLOW SOIL VCP CLEANUP ACTION <br /> 3.03 PREPARATION <br /> A. Protccuon: <br /> 1. Pcotect sucrounding Wock from damage or dis9gurarion. I'rotcct <br /> adjacent pavement cemaining in service from damage. <br /> 2. Protect existing uriliries from damagc and disrurbance. Pcovide <br /> shoring to support acisting utiliries and their support prism oc <br /> zcmove and ceplace utilities whete shoring is not pracrical. Removing <br /> and zeplaung urilitics to be performcd per utility ownec's standazds. <br /> 3. Ecect barriers a�d bacricadu ro direct and pcotect adjacent craffic. <br /> 4. Maintain watec service to exisring buildings and occupied building on <br /> site and for secvices off site. Coocdinate u�ich City and Engineer to <br /> decezmine rime and duration of requized watcr system shutdowns. <br /> 5. Pield-locate and mack existing utilities,whethex shown oz aoc,prior <br /> to construcuon,avoid damage or disrurbance. Pcotecc,maintain, and <br /> repair,where damaged. For aid in udlity]ocation call ]-800-424555, <br /> 46 hours (two wocking days) prior to beginning consuucrion. <br /> G. Pield snikc alignment and grade. Comply u�th City mquicemrnts. <br /> 3.04 LXECUTION <br /> A. E�cavauon and Backfill: <br /> ] Comply with Secdon 02327. Pcovide a;ua width crench as necessary <br /> where deflecdng pipe. E�ca��ate to depths required co provide <br /> minimum cova as indicatcd on dtawings. Escavatc dcepcc as <br /> requiced to accommodate changes in grade,vaults,connections,oz to <br /> install pipe undec existing pipelines oc ocher utiliues. Adjust pipe <br /> profile to pass below conflicting utiliries. Provide minimum 12-inch <br /> clearance. Depth Adjustments: 2 feet oc Icss at no adjuscmenc in <br /> cost. <br /> B. Inscallacion of Pipe and Pittings: <br /> ]. Inspect piae for steucmral defects and defects in coating and lining <br /> beEore it is placed in nench. (:lean pipe fittings and valves of ditt and <br /> foreign matecial as chey aze placed. Plug open ends oE pipe and <br /> &ttings u�ich temporary watertight plug whenever\Vork is stopped or <br /> ozsiav CONTRACT RECORD <br /> DOCUMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.