My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1205 CRAFTSMAN WAY PORT INFRASTRUCTURE 2016-01-01 MF Import
>
Address Records
>
CRAFTSMAN WAY
>
1205
>
PORT INFRASTRUCTURE
>
1205 CRAFTSMAN WAY PORT INFRASTRUCTURE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 12:53:14 AM
Creation date
2/12/2017 12:52:51 AM
Metadata
Fields
Template:
Address Document
Street Name
CRAFTSMAN WAY
Street Number
1205
Tenant Name
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT SECT[ON 02510 <br /> NORTH MARINA REDEVELOPMENT WATER DISTRIBUTION <br /> SEiAI.T-OW SOIL VCP CLEANUP ACTION <br /> chlorine. In rhe event chlocinc is noLxnally uscd in supply soucce, then tcscs <br /> shall show a zesidual not in excess of that carried in system. <br /> B. Dispose of chlorinated water pu DOE and Department of Fish and Wildlife <br /> requirements. Ncutralizc watu for prouction of aqu:.nc life in the receiving <br /> wauc befoce disposal into dreinage system. <br /> C. I.ocate a sample tap�ahead of flushing hose for convenience and saninry <br /> sampling. <br /> D. Before placing lines into ser��ce,a sarisfactory report shall be reccived from a <br /> certified mst lab on samples collected from representadve poinu in new <br /> system. Samples sl�all be collected and bacteriological tesu obtained by the <br /> Contractor. Costs of waccr sample analysis shall be bome by Conuactor as <br /> incidental Work to water main installavons. <br /> E. Should initial t�cavnent msult in an unsatisfactory b:utuiological tcst,repeat <br /> original chlorinating pcocedure unril satisfaccoq�results am obtained. Failure <br /> to obrain a sarisfactory bactcriological tcst will be considered as failure to <br /> keep pipe dcan during conscruction oz to properly chlorinat�the main. <br /> Addiuonal chlorinacing required to obtain satisfactory•test resul[shall be <br /> completed a[ no addiuonal eost to Porc. <br /> LND OP SECtION <br /> ozslo-i� CONTRACT RECORD <br /> DOCUMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.