Laserfiche WebLink
PORT OF EVERETT SECT[ON 02510 <br /> NORTH MARINA REDEVELOPMENT WATER DISTRIBUTION <br /> SEiAI.T-OW SOIL VCP CLEANUP ACTION <br /> chlorine. In rhe event chlocinc is noLxnally uscd in supply soucce, then tcscs <br /> shall show a zesidual not in excess of that carried in system. <br /> B. Dispose of chlorinated water pu DOE and Department of Fish and Wildlife <br /> requirements. Ncutralizc watu for prouction of aqu:.nc life in the receiving <br /> wauc befoce disposal into dreinage system. <br /> C. I.ocate a sample tap�ahead of flushing hose for convenience and saninry <br /> sampling. <br /> D. Before placing lines into ser��ce,a sarisfactory report shall be reccived from a <br /> certified mst lab on samples collected from representadve poinu in new <br /> system. Samples sl�all be collected and bacteriological tesu obtained by the <br /> Contractor. Costs of waccr sample analysis shall be bome by Conuactor as <br /> incidental Work to water main installavons. <br /> E. Should initial t�cavnent msult in an unsatisfactory b:utuiological tcst,repeat <br /> original chlorinating pcocedure unril satisfaccoq�results am obtained. Failure <br /> to obrain a sarisfactory bactcriological tcst will be considered as failure to <br /> keep pipe dcan during conscruction oz to properly chlorinat�the main. <br /> Addiuonal chlorinacing required to obtain satisfactory•test resul[shall be <br /> completed a[ no addiuonal eost to Porc. <br /> LND OP SECtION <br /> ozslo-i� CONTRACT RECORD <br /> DOCUMENT <br />