Laserfiche WebLink
; <br /> PORT OF EVERETT SECTION 02321 , <br /> NORTH MARINA REDEVELOPMENT EXCAVATIIdG,BACRFILLING,AND <br /> SHAI.LOW SOIL VCP CLEANUP ACTION COMPACTING FOR U�U�SU� <br /> G. Rcferencc surve}'monumena and benchmacks,property comezs,and <br /> survcy control points that may be disrurbed by Work. <br /> 7. Pcotect existing stiuctuces scheduled to remain. <br /> 8. Protect pavement or paved areas intended to rcmain from damage. <br /> 9. Ezect barriecs and barricades to direct and protect adjacent traffic. <br /> t0. Use all means necessary to prevent uosion of freshly graded aceas <br /> during consttucrion or until pecmanent drainage and erosion control <br /> measures are fully operarional. <br /> ll. Ro-esreblish bench macks,monumcnts and pioperty comcu <br /> disturbed as pan of constmction. <br /> 3.03 CONSTRUCTION <br /> A. Gcade and Alignmcnr. <br /> ]. IdcnriCy and set requircd Gnes,levels, contours,and datum. <br /> 2. Stake aligntnent and gcade and constmct in locations sho�vn on <br /> Drawings. <br /> 3. Comply with Ci�y rcquiccmcnts for watcr, scu�cr, and storm drainagc. <br /> 4. Establish extent of excavadon by area and elevadon. <br /> 5. Adjusc alignment and grade to accommodace confliccs and ficld <br /> conditions. Obtain Engineer approval befoxe adjustrnents. <br /> B. Shoring and Bracing of Excavation: <br /> 1. Provide sheeting, shoring,and bracing per stace and local codes. <br /> 2. Do noc use horizontal swtting bdow pipe bazrel. <br /> 3. Do not use pipe as suppoa foc trench braung. <br /> 4. Do not remove shoring below rop uf pipe• <br /> 5. Backfill immcdiaccl�� following removal of shoring and 'oracing. <br /> CONTRACT RECORD <br /> o232i-s DOCUMENT <br />