Laserfiche WebLink
PORT OF EVERETT SECTION 02321 <br /> NOR'I'H MARINA REDEVELOPMENT EXCAVATIIdG,BACRFILLING,AND <br /> gHALLOW SOIL VCP CLEANUP ACTION COMPACTING FOR UTILITIC�� <br /> 2. If tats indicate Work does not mect specified cequicements,re- <br /> compact and te-test. <br /> D. Inspection:Observations rcquued b}Engincer. <br /> I. ABex completion of crench and before placing pipe. <br /> 2. Afcer completion of pipe and bedding and before backfilling. <br /> 3.0G PROTECTTON <br /> A. Protect bottom of excavarions and soil adjacent to and beneath foundacions <br /> from frcezing. <br /> B, Pcotect excavated material and excavating foundation (sub grade) from <br /> damage due ro excess moisture. <br /> C. Dcwatcr as nccessaq'. <br /> 3.07 CLL•AN-UP <br /> A. Dtspose of surplus oc uns�ucible matecial. <br /> B. Remove abandoned pipe,bcoken pavemenc,and mbbish from project site. <br /> C. Dispose of waste,su:plus, and unswtable materials according to laws, <br /> regulations,and ordinances,oEf site at a site obtained by Contractor. <br /> D. Provide certificauo� letta from disposal site opecacor scadng eha:disposal <br /> site complies witk� local,state,and Cederal cegu)auons. <br /> LND OF SECTION <br /> oz3zi-io GpNTRACT RECORD <br /> DOCUMENT <br />