Laserfiche WebLink
• II <br /> � <br /> PORT OF EVE1tETI' SECTION 02533 <br /> NORTH MARINA REDEVELOPMENT SANITARY SEVVAGE SERVICE <br /> gIi�1LLOW SOIL VCP CLEANUP ACTION <br /> 5, Vcrify and coozdinate locauon of exisring pressure sewer on float and <br /> adjustlocationsto macch. <br /> 3.02 PREPARATION <br /> A, Protccrion: <br /> 1. Pcotcct cicmrnts suriounding Wock of this scction from damage or <br /> dis6guradon. <br /> 2. Pcotcct existing utiliries from damage and distucbance. Providc shoring <br /> to support existing utilirics and their support prism oc:emove and <br /> ceplace utiGties wheie shoring is not pcacvcal. Removing and replaung <br /> to be perfocmed pec utility ownds standards. <br /> 3. Keep excavadon fcee of standing water. <br /> 4. Procect finished Wozk,pipe,and bedding from damage or displacemenc <br /> uncil backfilling operation is in progcess. <br /> 5. Protect finished and backfilled�vock from damage• <br /> 3.03 INSTALLATION <br /> �1, Excavation,Poundation,and Bedding. In accoidance u�ith Section 02321. <br /> B. Connection to Exisuug Systcm: <br /> 1. Comply wich City of Everett Scandaids. <br /> 2. Remove debris by sczeening flushing water priot to discharge to <br /> existing sewer system. <br /> C. Pipe Installation (Gtaviry Pipe): <br /> 1. Comply with Ciry of Everett and\�i�SllOT Standa:ds. <br /> 2. Follow manufactu:ei s installarion procedures. <br /> 3, L,ay pipe to line and gtadc indicated in Drawings. <br /> 4. Maintain Gne and grade foz sttaighc secuons with lascr beam operatcd <br /> by qualified personnel. Check line and grade constandy. If they do <br /> noc meec speufied limi�s,srop wock immediatdy and zemedy chc <br /> causc beforc proceeding. <br /> CONTRACT RECORD <br /> o2s33-s DOCUMENT <br />